Inventor
PELEGRI LUIS M
US19 patents
⚠️ This page may combine multiple inventors who share the name “PELEGRI LUIS M”. Patents are grouped by organization below to help distinguish them — per-person disambiguation is on the roadmap.
BAKER HUGHES INC
17 patentsUS7408355B1Aug 5, 2008
Borehole conductivity simulator verification and transverse coil balancing
BAKER HUGHES INC13 citations84
US7379818B2May 27, 2008
Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
BAKER HUGHES INC16 citations83
US7333891B2Feb 19, 2008
Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
BAKER HUGHES INC15 citations83
US7268555B1Sep 11, 2007
Correction of cross-component induction measurements for misalignment using comparison of the XY formation response
BAKER HUGHES INC14 citations83
US7778778B2Aug 17, 2010
Correction of multi-component measurements for tool eccentricity in deviated wells
BAKER HUGHES INC11 citations82
US7629791B2Dec 8, 2009
Method and apparatus for making multi-component measurements in deviated wells
BAKER HUGHES INC12 citations82
US7629792B2Dec 8, 2009
Correction of misalignment of antennas in a downhole logging tool
BAKER HUGHES INC7 citations73
US7319331B2Jan 15, 2008
Two loop calibrator
BAKER HUGHES INC8 citations73
US8354846B2Jan 15, 2013
Method and apparatus for reducing effect of tool eccentricity in a borehole on multi-axial induction measurements
BAKER HUGHES INC4 citations63
US7932723B2Apr 26, 2011
Borehole conductivity simulator verification and transverse coil balancing
BAKER HUGHES INC3 citations63
US7759940B2Jul 20, 2010
Mutual shielding of collocated induction coils in multi-component induction logging instruments
BAKER HUGHES INC5 citations63
US7629793B2Dec 8, 2009
Correction of misalignment of antennas in a logging tool
BAKER HUGHES INC3 citations63
US7898260B2Mar 1, 2011
Method and apparatus for detecting borehole effects due to eccentricity of induction instruments
BAKER HUGHES INC2 citations62
US7652478B2Jan 26, 2010
Cross-component alignment measurement and calibration
BAKER HUGHES INC5 citations62
US7205770B2Apr 17, 2007
Borehole conductivity simulator verification and transverse coil balancing
BAKER HUGHES INC6 citations62
US7952358B2May 31, 2011
Methods and apparatus for determination of a formation resistivity property using eccentered measurements
BAKER HUGHES INC4 citations57
US7969153B2Jun 28, 2011
Borehole conductivity simulator verification and transverse antenna balancing
BAKER HUGHES INC0 citations52