Inventor · disambiguated record
Kenneth M. Nevlud
Also filed as: NEVLUD KENNETH · NEVLUD KENNETH M
9 granted patents·2 pending applications·100 citations·filing 2004–2020
85Inventor score
Files withSMITH INTERNATIONAL5SHEAR BITS LTD2SWADI SHANTANU N1WELLBORE INTEGRITY SOLUTIONS LLC1WILDCAT OIL TOOLS INC1
Top patents by PatentIndex Score
11 records- 0184US9951563B2Wellbore mill having shear cutters and gouging cuttersSHEAR BITS LTD·Filed 2015·Granted Apr 24, 2018·6 cites·20 claims
- 0282US7493971B2Concentric expandable reamer and methodSMITH INTERNATIONAL·Filed 2004·Granted Feb 24, 2009·66 cites·55 claims
- 0377US7703550B2Down hole motor with locking mechanismSMITH INTERNATIONAL·Filed 2005·Granted Apr 27, 2010·18 cites·18 claims
- 0474US8997895B2System and method for coupling an impregnated drill bit to a whipstockSWADI SHANTANU N·Filed 2012·Granted Apr 7, 2015·5 cites·27 claims
- 0564US7448455B2Turbodrill with asymmetric stator and rotor vanesSMITH INTERNATIONAL·Filed 2005·Granted Nov 11, 2008·3 cites·16 claims
- 0663US10570664B2Wellbore reaming tool having shear cutters and gouging cuttersSHEAR BITS LTD·Filed 2018·Granted Feb 25, 2020·1 cites·19 claims
- 0755US9512690B2Milling cutter having undulating chip breakerSMITH INTERNATIONAL·Filed 2013·Granted Dec 6, 2016·1 cites·21 claims
- 0847US10202806B2Bearing assembly for a drilling toolSMITH INTERNATIONAL·Filed 2014·Granted Feb 12, 2019·0 cites·20 claims
- 0944US10590724B2Mill with adjustable gauge diameterWELLBORE INTEGRITY SOLUTIONS LLC·Filed 2014·Granted Mar 17, 2020·0 cites·7 claims
- 1036US2020011134A1Bi-mill for milling an opening through a wellbore casing and in a preplanned lateral drilling path in departure from the wellbore axisWILDCAT OIL TOOLS INC·Filed 2019·Application pending·0 cites
- 1132US2020318435A1Bi-mill deployed with dual-action hydraulically operable anchor and methods of operation and manufacture for wellbore departure millingWILDCAT OIL TOOLS LLC·Filed 2020·Application pending·0 cites
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →