Inventor
HAILEY JR TRAVIS T
US20 patents
⚠️ This page may combine multiple inventors who share the name “HAILEY JR TRAVIS T”. Patents are grouped by organization below to help distinguish them — per-person disambiguation is on the roadmap.
HALLIBURTON ENERGY SERV INC
19 patentsUS7802621B2Sep 28, 2010
Inflow control devices for sand control screens
HALLIBURTON ENERGY SERV INC56 citations98
US7708068B2May 4, 2010
Gravel packing screen with inflow control device and bypass
HALLIBURTON ENERGY SERV INC76 citations98
US7451815B2Nov 18, 2008
Sand control screen assembly enhanced with disappearing sleeve and burst disc
HALLIBURTON ENERGY SERV INC121 citations98
US7096945B2Aug 29, 2006
Sand control screen assembly and treatment method using the same
HALLIBURTON ENERGY SERV INC196 citations98
US6899176B2May 31, 2005
Sand control screen assembly and treatment method using the same
HALLIBURTON ENERGY SERV INC159 citations98
US6719051B2Apr 13, 2004
Sand control screen assembly and treatment method using the same
HALLIBURTON ENERGY SERV INC181 citations98
US6581689B2Jun 24, 2003
Screen assembly and method for gravel packing an interval of a wellbore
HALLIBURTON ENERGY SERV INC100 citations98
US6543545B1Apr 8, 2003
Expandable sand control device and specialized completion system and method
HALLIBURTON ENERGY SERV INC319 citations98
US6516881B2Feb 11, 2003
Apparatus and method for gravel packing an interval of a wellbore
HALLIBURTON ENERGY SERV INC102 citations98
US7367395B2May 6, 2008
Sand control completion having smart well capability and method for use of same
HALLIBURTON ENERGY SERV INC75 citations97
US6766862B2Jul 27, 2004
Expandable sand control device and specialized completion system and method
HALLIBURTON ENERGY SERV INC84 citations97
US6557634B2May 6, 2003
Apparatus and method for gravel packing an interval of a wellbore
HALLIBURTON ENERGY SERV INC91 citations96
US6488082B2Dec 3, 2002
Remotely operated multi-zone packing system
HALLIBURTON ENERGY SERV INC88 citations96
US7108083B2Sep 19, 2006
Apparatus and method for completing an interval of a wellbore while drilling
HALLIBURTON ENERGY SERV INC108 citations95
US6516882B2Feb 11, 2003
Apparatus and method for gravel packing an interval of a wellbore
HALLIBURTON ENERGY SERV INC62 citations95
US7243724B2Jul 17, 2007
Apparatus and method for treating an interval of a wellbore
HALLIBURTON ENERGY SERV INC40 citations92
US6932157B2Aug 23, 2005
Apparatus and method for treating an interval of a wellbore
HALLIBURTON ENERGY SERV INC21 citations92
US6675891B2Jan 13, 2004
Apparatus and method for gravel packing a horizontal open hole production interval
HALLIBURTON ENERGY SERV INC61 citations92
US6715545B2Apr 6, 2004
Transition member for maintaining for fluid slurry velocity therethrough and method for use of same
HALLIBURTON ENERGY SERV INC34 citations89