Inventor · disambiguated record
Michael J. Wenzel
Also filed as: WENZEL MICHAEL · WENZEL MICHAEL J
187 granted patents·28 pending applications·3,563 citations·filing 2011–2025
99Inventor score
Files withJOHNSON CONTROLS TECH CO123Johnson Controls Tyco IP Holdings LLP33TYCO FIRE & SECURITY GMBH31CON EDISON BATTERY STORAGE LLC20DREES KIRK H4
Top patents by PatentIndex Score
215 records- 0199US10949777B2Building energy optimization system with economic load demand response (ELDR) optimizationJOHNSON CONTROLS TECH CO·Filed 2017·Granted Mar 16, 2021·98 cites·20 claims
- 0299US10359748B2Building energy cost optimization system with asset sizingJOHNSON CONTROLS TECH CO·Filed 2017·Granted Jul 23, 2019·78 cites·20 claims
- 0399US10101730B2Incorporating a load change penalty in central plant optimizationJOHNSON CONTROLS TECH CO·Filed 2015·Granted Oct 16, 2018·40 cites·20 claims
- 0499US9436179B1Systems and methods for energy cost optimization in a building systemJOHNSON CONTROLS TECH CO·Filed 2013·Granted Sep 6, 2016·136 cites·15 claims
- 0599US9355069B2Systems and methods for determining the uncertainty in parameters of an energy use modelJOHNSON CONTROLS TECH CO·Filed 2013·Granted May 31, 2016·52 cites·14 claims
- 0699US9235657B1System identification and model developmentJOHNSON CONTROLS TECH CO·Filed 2013·Granted Jan 12, 2016·154 cites·20 claims
- 0799US8532808B2Systems and methods for measuring and verifying energy savings in buildingsDREES KIRK H·Filed 2011·Granted Sep 10, 2013·222 cites·21 claims
- 0898US11598544B1Building system for building equipment with data health operationsJohnson Controls Tyco IP Holdings LLP·Filed 2022·Granted Mar 7, 2023·25 cites·20 claims
- 0998US11416796B2Control system for generating and distributing energy resources and operating building equipment accounting for resource provider contraintsJOHNSON CONTROLS TECH CO·Filed 2020·Granted Aug 16, 2022·15 cites·20 claims
- 1098US11274842B2Systems and methods for optimizing ventilation, filtration, and conditioning schemes for buildingsJOHNSON CONTROLS TECH CO·Filed 2020·Granted Mar 15, 2022·10 cites·20 claims
- 1198US11275363B2Central plant control system with plug and play EMPCJohnson Controls Tyco IP Holdings LLP·Filed 2020·Granted Mar 15, 2022·18 cites·20 claims
- 1298US11068821B2Building energy optimization system with capacity market program (CMP) participationJOHNSON CONTROLS TECH CO·Filed 2019·Granted Jul 20, 2021·31 cites·20 claims
- 1398US10909642B2Building energy storage system with multiple demand charge cost optimizationJOHNSON CONTROLS TECH CO·Filed 2019·Granted Feb 2, 2021·27 cites·20 claims
- 1498US10706375B2Central plant with asset allocatorJOHNSON CONTROLS TECH CO·Filed 2017·Granted Jul 7, 2020·51 cites·20 claims
- 1598US10386820B2Incorporating a demand charge in central plant optimizationJOHNSON CONTROLS TECH CO·Filed 2015·Granted Aug 20, 2019·22 cites·18 claims
- 1698US10282796B2Building energy storage system with multiple demand charge cost optimizationJOHNSON CONTROLS TECH CO·Filed 2017·Granted May 7, 2019·39 cites·20 claims
- 1798US10250039B2Energy storage controller with battery life modelCON EDISON BATTERY STORAGE LLC·Filed 2016·Granted Apr 2, 2019·76 cites·20 claims
- 1898US10222083B2Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programsJOHNSON CONTROLS TECH CO·Filed 2016·Granted Mar 5, 2019·38 cites·18 claims
- 1998US10190793B2Building management system with electrical energy storage optimization based on statistical estimates of IBDR event probabilitiesJOHNSON CONTROLS TECH CO·Filed 2016·Granted Jan 29, 2019·46 cites·20 claims
- 2098US10175681B2High level central plant optimizationJOHNSON CONTROLS TECH CO·Filed 2015·Granted Jan 8, 2019·59 cites·20 claims
- 2198US10007259B2Systems and methods for energy cost optimization in a building systemJOHNSON CONTROLS TECH CO·Filed 2016·Granted Jun 26, 2018·39 cites·20 claims
- 2298US9852481B1Systems and methods for cascaded model predictive controlJOHNSON CONTROLS TECH CO·Filed 2013·Granted Dec 26, 2017·79 cites·10 claims
- 2398US9390388B2Systems and methods for measuring and verifying energy usage in a buildingDREES KIRK H·Filed 2012·Granted Jul 12, 2016·36 cites·23 claims
- 2498US9354968B2Systems and methods for data quality control and cleansingJOHNSON CONTROLS TECH CO·Filed 2012·Granted May 31, 2016·194 cites·20 claims
- 2598US9286582B2Systems and methods for detecting changes in energy usage in a buildingDREES KIRK H·Filed 2011·Granted Mar 15, 2016·227 cites·20 claims
- 2698US9196009B2Systems and methods for detecting changes in energy usage in a buildingDREES KIRK H·Filed 2011·Granted Nov 24, 2015·234 cites·8 claims
- 2798US8843238B2Systems and methods for controlling energy use in a building management system using energy budgetsWENZEL MICHAEL J·Filed 2011·Granted Sep 23, 2014·318 cites·20 claims
- 2897US11675322B2Predictive building control system with discomfort threshold adjustmentJOHNSON CONTROLS TECH CO·Filed 2021·Granted Jun 13, 2023·12 cites·22 claims
- 2997US11086276B2System identification and model developmentJOHNSON CONTROLS TECH CO·Filed 2018·Granted Aug 10, 2021·17 cites·20 claims
- 3097US11061424B2Building energy storage system with peak load contribution and stochastic cost optimizationJOHNSON CONTROLS TECH CO·Filed 2019·Granted Jul 13, 2021·22 cites·20 claims
- 3197US10956842B2Central plant with asset allocatorJOHNSON CONTROLS TECH CO·Filed 2019·Granted Mar 23, 2021·25 cites·30 claims
- 3297US10955800B2Central plant control system, method, and controller with multi-level granular and non-granular asset allocationJOHNSON CONTROLS TECH CO·Filed 2019·Granted Mar 23, 2021·27 cites·20 claims
- 3397US10915094B2High level central plant optimizationJOHNSON CONTROLS TECH CO·Filed 2018·Granted Feb 9, 2021·21 cites·20 claims
- 3497US10876754B2Dynamic central plant control based on load predictionJOHNSON CONTROLS TECH CO·Filed 2018·Granted Dec 29, 2020·21 cites·20 claims
- 3597US10824125B2Central plant control system based on load prediction through mass storage modelJOHNSON CONTROLS TECH CO·Filed 2018·Granted Nov 3, 2020·18 cites·18 claims
- 3697US10678227B2Central plant control system with plug and play EMPCJOHNSON CONTROLS TECH CO·Filed 2018·Granted Jun 9, 2020·29 cites·20 claims
- 3797US10418833B2Electrical energy storage system with cascaded frequency response optimizationCON EDISON BATTERY STORAGE LLC·Filed 2016·Granted Sep 17, 2019·28 cites·20 claims
- 3897US10317864B2Systems and methods for adaptively updating equipment modelsJOHNSON CONTROLS TECH CO·Filed 2017·Granted Jun 11, 2019·20 cites·20 claims
- 3997US10283968B2Power control system with power setpoint adjustment based on POI power limitsCON EDISON BATTERY STORAGE LLC·Filed 2016·Granted May 7, 2019·21 cites·18 claims
- 4097US10146237B2Smart thermostat with model predictive controlJOHNSON CONTROLS TECH CO·Filed 2017·Granted Dec 4, 2018·16 cites·18 claims
- 4197US10088814B2System identification and model developmentJOHNSON CONTROLS TECH CO·Filed 2015·Granted Oct 2, 2018·23 cites·20 claims
- 4297US9778639B2Systems and methods for adaptively updating equipment modelsJOHNSON CONTROLS TECH CO·Filed 2014·Granted Oct 3, 2017·55 cites·16 claims
- 4397US9322566B2Systems and methods for controlling energy use during a demand limiting periodJOHNSON CONTROLS TECH CO·Filed 2014·Granted Apr 26, 2016·39 cites·20 claims
- 4496US12222120B2Smart thermostat with model predictive controlTYCO FIRE & SECURITY GMBH·Filed 2023·Granted Feb 11, 2025·2 cites·20 claims
- 4596US11703246B2Building HVAC system with fault-adaptive model predictive controlJohnson Controls Tyco IP Holdings LLP·Filed 2021·Granted Jul 18, 2023·4 cites·15 claims
- 4696US11296511B2Energy storage controller with battery life modelCON EDISON BATTERY STORAGE LLC·Filed 2020·Granted Apr 5, 2022·4 cites·20 claims
- 4796US11283669B1Building management system with control frameworkJOHNSON CONTROLS TECH CO·Filed 2020·Granted Mar 22, 2022·5 cites·15 claims
- 4896US11281173B2Systems and methods for maintaining occupant comfort for various environmental conditionsJOHNSON CONTROLS TECH CO·Filed 2019·Granted Mar 22, 2022·12 cites·22 claims
- 4996US11238547B2Building energy cost optimization system with asset sizingJOHNSON CONTROLS TECH CO·Filed 2019·Granted Feb 1, 2022·7 cites·20 claims
- 5096US11164126B2Cost optimization of a central energy facility with block-and-index rate structureJOHNSON CONTROLS TECH CO·Filed 2018·Granted Nov 2, 2021·14 cites·22 claims
Showing the top 50 of 215 patent records by PatentIndex Score.
Join the waitlist — get patent alerts
Get an alert when Michael J. Wenzel files or is granted a new patent.
We store only your email — no account needed. See our privacy policy.
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →