Inventor · disambiguated record
Robert A. Yannone
Also filed as: SHIELDS JAMES J · YANNONE ROBERT A · YANNONE ROBERT ALFRED
17 granted patents·994 citations·filing 1972–1995
96Inventor score
Top patents by PatentIndex Score
17 records- 0198US4283634ASystem and method for monitoring and controlling operation of industrial gas turbine apparatus and gas turbine electric power plants preferably with a digital computer control systemWESTINGHOUSE ELECTRIC CORP·Filed 1972·Granted Aug 11, 1981·137 cites·15 claims
- 0296US4380146ASystem and method for accelerating and sequencing industrial gas turbine apparatus and gas turbine electric power plants preferably with a digital computer control systemWESTINGHOUSE ELECTRIC CORP·Filed 1979·Granted Apr 19, 1983·135 cites·12 claims
- 0396US4314441AGas turbine power plant control apparatus including an ambient temperature responsive control systemWESTINGHOUSE ELECTRIC CORP·Filed 1979·Granted Feb 9, 1982·91 cites·12 claims
- 0496US3955359ABearing temperature system failure detection apparatus suitable for use in power plants and like apparatusWESTINGHOUSE ELECTRIC CORP·Filed 1973·Granted May 11, 1976·91 cites·15 claims
- 0591US5748500ASystem to assess the starting performance of a turbineELECTRIC POWER RES INST·Filed 1995·Granted May 5, 1998·125 cites·27 claims
- 0691US4208591AGas turbine power plant control apparatus including a turbine load control systemWESTINGHOUSE ELECTRIC CORP·Filed 1973·Granted Jun 17, 1980·51 cites·20 claims
- 0789US4051669AGas turbine power plant control apparatus having a multiple backup control systemWESTINGHOUSE ELECTRIC CORP·Filed 1974·Granted Oct 4, 1977·46 cites·40 claims
- 0889US4039804ASystem and method for monitoring industrial gas turbine operating parameters and for providing gas turbine power plant control system inputs representative thereofWESTINGHOUSE ELECTRIC CORP·Filed 1973·Granted Aug 2, 1977·47 cites·2 claims
- 0985US4019315AGas turbine power plant control apparatus including a temperature reset starting control system and an ignition pressure control systemWESTINGHOUSE ELECTRIC CORP·Filed 1973·Granted Apr 26, 1977·37 cites·58 claims
- 1084US4259835ASystem and method for monitoring industrial gas turbine operating parameters and for providing gas turbine power plant control system inputs representative thereofWESTINGHOUSE ELECTRIC CORP·Filed 1978·Granted Apr 7, 1981·46 cites·3 claims
- 1176US4305129ASystem for providing load-frequency control through predictively and _dynamically dispatched gas turbine-generator unitsWESTINGHOUSE ELECTRIC CORP·Filed 1980·Granted Dec 8, 1981·43 cites·5 claims
- 1275US4349744ASystem for operating multiple gas turbines for coordinated dead load pickupWESTINGHOUSE ELECTRIC CORP·Filed 1980·Granted Sep 14, 1982·42 cites·12 claims
- 1373US4103178ABlack start system for large steam powered electric generation plantsWESTINGHOUSE ELECTRIC CORP·Filed 1977·Granted Jul 25, 1978·21 cites·7 claims
- 1473US3943373AGas turbine power plant control apparatus including a speed/load hold and lock systemWESTINGHOUSE ELECTRIC CORP·Filed 1973·Granted Mar 9, 1976·23 cites·20 claims
- 1569US4242592AGas turbine power plant control apparatus including an ambient temperature responsive control systemWESTINGHOUSE ELECTRIC CORP·Filed 1977·Granted Dec 30, 1980·27 cites·23 claims
- 1662US3943371AGas turbine power plant control apparatus including automatic load pickupWESTINGHOUSE ELECTRIC CORP·Filed 1973·Granted Mar 9, 1976·16 cites·23 claims
- 1759US3975902ALocal maintenance controller for gas turbine power plants having a primary control systemWESTINGHOUSE ELECTRIC CORP·Filed 1974·Granted Aug 24, 1976·16 cites·5 claims
Join the waitlist — get patent alerts
Get an alert when Robert A. Yannone files or is granted a new patent.
We store only your email — no account needed. See our privacy policy.
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →