Construction management system, construction management method, and management device
Abstract
A construction management system includes: an object detecting unit mounted on a work machine and configured to detect an object in a construction site and output information on the object; a shape detecting unit configured to output shape information indicating a three-dimensional shape of the object by using the information on the object detected by the object detecting unit; an information attaching unit configured to attach, to the shape information, time information indicating a time when the object is detected; and a management device configured to generate current state information on the construction site on the basis of the shape information to which a latest piece of the time information is attached.
Claims
exact text as granted — not AI-modifiedThe invention claimed is:
1. A construction management system of a work machine with a swing body and a traveling body, comprising:
a shape measuring system provided in the swing body;
a storage unit configured to store a plurality of shape information obtained by the shape measuring system with the swing body swung; and
a processing unit configured to generate a site shape information of a construction site including a construction object constructed by a different work machine other than the work machine, by combining the plurality of shape information.
2. The construction management system according to claim 1 , further comprising:
a communication unit configured to transmit the site shape information to the different work machine.
3. A construction management system of a work machine with a swing body and a traveling body, comprising:
an imaging device provided in the swing body;
a storage unit configured to store a plurality of images captured by the imaging device with the swing body swung; and
a processing unit configured to apply image processing by a stereo method to the plurality of images so as to generate a plurality of shape information; wherein
the processing unit is further configured to generate a site shape information of a construction site including a construction object constructed by a different work machine other than the work machine, by combining the plurality of shape information.
4. A construction management method of a work machine with a swing body and a traveling body, comprising:
obtaining a plurality of shape information, by the shape measuring system provided in the swing body with the swing body swung; and
generating a site shape information of a construction site including a construction object constructed by a different work machine other than the work machine, by combining the plurality of shape information.
5. A construction management method of a work machine with a swing body and a traveling body, comprising:
capturing a plurality of images by the imaging device provided in the swing body with the swing body swung;
applying image processing by a stereo method to the plurality of images so as to generate a plurality of shape information; and
generating a site shape information of a construction site including a construction object constructed by a different work machine other than the work machine, by combining the plurality of shape information.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.