Method and apparatus for suction anchor and mooring deployment and connection
Abstract
A method and apparatus for deployment of mooring systems for mobile offshore drilling units and for connecting the same to the mooring lines thereof. An anchor handling vessel is provided for transporting at least one suction anchor having a deployment connection and a mooring connection. The, said anchor handling vessel incorporates an anchor deployment mechanism having a handling wire with a quick-disconnect socket connector for accomplishing movement of said suction anchor from the service vessel for line deployment to the sea bottom. After deployment of the suction anchor, disconnecting the handling wire from the deployment connection and moving it to the mooring connection, such that the handling wire becomes the main mooring wire. Connecting buoys with the main mooring wire to position it for recovery. Repeating such procedure for each of the plurality suction anchors and mooring wires of the mobile offshore drilling unit.
Claims
exact text as granted — not AI-modified1 . A method for deployment of mooring systems for mobile offshore drilling units and for connecting the same to the mooring lines thereof, comprising:
(a) providing an anchor handling vessel having a stem roller and having at least one suction anchor thereon having a deployment connection and a mooring connection, said anchor handling vessel having an anchor deployment mechanism incorporating a handling wire having a quick-disconnect socket connector for accomplishing movement of said suction anchor over said stern roller for line deployment to the sea bottom; (b) after deployment of said suction anchor, disconnecting said handling wire from said deployment connection and moving said anchor handling wire from said deployment connection to said mooring connection, said handling wire becoming the main mooring wire; (c) connecting syntactic buoy means with said main mooring wire for elevating said main mooring wire for recovery; and (d) repeating said method steps (a)-(c) for each plurality suction anchors and mooring wires.
2 . A method for stationing a mobile offshore drilling rig to a pre-deployed rig mooring system having a plurality of suction anchors to which is connected a plurality of mooring wires having syntactic buoys elevating the ends of the mooring wires above the sea bottom, comprising:
(a) recovering said syntactic buoys with the lifting winch of a service vessel; (b) connecting said mooring wires to the mooring wires of said mobile offshore drilling unit; (c) attaching a length of chain to each of said mooring wires and installing a J-chaser stopper device to said length of chain, the mooring wire, chain and J-chaser stopper being a mooring string; (d) lowering the mooring string from the service vessel with a J-chaser to permit said mobile offshore drilling unit to accept the weight of said mooring string; and (e) with said service vessel, sliding said J-chaser along said mooring wire toward said mobile offshore drilling unit until said J-chaser moves free of said mooring wire.Cited by (0)