US2004123553A1PendingUtilityA1
Method of reinforcing a tower
Est. expiryDec 18, 2022(expired)· nominal 20-yr term from priority
Inventors:Marcus Gruetzmacher
E04G 23/0218E04G 23/0225
37
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method for reinforcing a tower is provided by embedding a length the tower in a reinforcement column formed of reinforcement material.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method of reinforcing a tower comprising:
forming a reinforcement column including: applying a fluid reinforcing material to embed a vertical length of the tower; and holding the fluid reinforcing material in place along the vertical length of the tower until it solidifies to form the reinforcement column having the length of tower embedded therein.
2 . The method of reinforcing a tower as in claim 1 , wherein the tower is a guy tower comprising a metal skeletal structure.
3 . The method of reinforcing a tower as in claim 1 , wherein the tower is a monopole tower comprising a metal tubular structure.
4 . The method of reinforcing a tower as in claim 1 , wherein the fluid reinforcing material comprises wet concrete cement.
5 . The method of reinforcing a tower as in claim 1 , further comprising embedding a plurality of spaced apart tension cables into and extended vertically through the reinforcement column.
6 . The method of reinforcing a tower as in claim 1 , wherein applying the fluid reinforcing material comprises pouring the fluid reinforcing material into a mold around the tower.
7 . The method of reinforcing a tower as in claim 1 , wherein applying the fluid reinforcing material comprises spraying the fluid reinforcing material onto the vertical length of the tower.
8 . A method of reinforcing a tower comprising:
a. forming a mold in the shape of a column around a portion of the tower; b. pouring wet concrete cement into the mold; c. allowing the poured wet concrete cement to at least partially solidify in mold; and d. releasing the mold from the partially solidified concrete cement so that a concrete reinforcement column is formed encapsulating the tower.
9 . The method of forming a concrete column in claim 8 , wherein forming the mold further comprises forming a cylindrically shaped mold.
10 . The method of forming a concrete column in claim 8 , further comprising molding a plurality of spaced apart tension cables into and extending vertically through the concrete reinforcement column.
11 . The method of forming a concrete column as in claim 8 , further comprising providing tensioners for tensioning the tension cables.
12 . The method of forming a concrete column as in claim 10 , further comprising providing tensioners for tensioning the tension cables from the bottom of the concrete reinforcement column.
13 . The method of forming a concrete column as in claim 10 further comprising providing tensioners for tensioning the tension cables from the top of the reinforcement column.
14 . The method of reinforcing a tower as in claim 8 , further comprising attaching an antenna support structure to the tower structure that is partially embedded as the reinforcement column is formed.
15 . The method of reinforcing a tower as in claim 8 , further comprising attaching an antenna support structure by clamping or otherwise to the concrete reinforcement column after the reinforcement column is formed.
16 . The method of reinforcing a tower as in claim 8 , further comprising attaching an antenna support structure to an un-embedded portion of the guy tower above the reinforcement column.
17 . A method of reinforcing a metal guy tower comprising forming a concrete reinforcement column with an existing vertical length of the guy tower embedded in the reinforcement column.
18 . The method of reinforcing a guy tower as in claim 17 , wherein forming a concrete reinforcement column further comprises:
a. forming a mold around a lower portion of the guy tower to form a lower column section; b. pouring wet concrete into the mold; c. allowing the poured concrete to at least partially cure; d. releasing the mold from the lower column section; e. raising the mold and positioning the mold at an upper portion of the tower contiguous with the lower portion of the tower; and f. molding an upper column section contiguous with the lower column section.
19 . The method of reinforcing a guy tower as in claim 17 , wherein forming a concrete reinforcement column further comprises:
a. forming a mold from the bottom of the guy tower to a desired height of the concrete reinforcement column; b. pouring concrete into the mold; c. allowing the poured concrete to at least partially cure; and d. releasing the mold from the concrete reinforcement column.
20 . The method of reinforcing a guy tower as in claim 17 , wherein forming a concrete reinforcement column comprises forming a concrete column extending only partially along the entire vertical length of the guy tower.
21 . The method of reinforcing a guy tower as in claim 17 , wherein forming a concrete reinforcement column comprises forming a concrete column extending the entire vertical length of the guy tower.
22 . The method of reinforcing a guy tower as in claim 17 , further comprising:
a. removing guy wires as the concrete reinforcement column is molded upward; b. adding brackets connected to the concrete reinforcement column; c. removing the mold from the concrete reinforcement column; and d. attaching the guy wires to the brackets.
23 . The method of reinforcing a guy tower as in claim 17 , further comprising molding an antenna support structure into the concrete reinforcement column.
24 . The method of reinforcing a guy tower as in claim 17 , further comprising attaching an antenna support structure to the tower structure that is partially embedded in the concrete reinforcement column as the reinforcement column is formed.
25 . The method of reinforcing a guy tower as in claim 17 , further comprising attaching an antenna support structure by clamping or otherwise to the concrete reinforcement column after the concrete reinforcement column is formed.
26 . The method of reinforcing a guy tower as in claim 17 , further comprising attaching an antenna support structure to an un-embedded portion of the guy tower above the concrete reinforcement column.
27 . The method of reinforcing a guy tower as in claim 17 , wherein forming the mold further comprises forming a cylindrically shaped mold.
28 . The method of reinforcing a guy tower as in claim 17 , further comprising molding a plurality of spaced apart tension cables into and extending vertically through the concrete reinforcement column.
29 . The method of reinforcing a guy tower as in claim 28 , further comprising providing a tensioner for tensioning the tension cables in the concrete reinforcement column.
30 . A method of reinforcing a monopole tower comprising forming a concrete reinforcement column encapsulating a vertical length of the monopole tower.
31 . The method of reinforcing a monopole tower as in claim 30 , wherein forming a concrete reinforcement column further comprises:
a. forming a mold around a portion of the monopole tower; b. pouring concrete into the mold; c. allowing the poured concrete to at least partially solidify; and d. releasing the mold from the partially solidified concrete.
32 . The method of reinforcing a monopole tower as in claim 30 , wherein forming a concrete reinforcement column further comprises:
a. forming a mold around a lower portion of the monopole tower to form a lower column section; b. pouring wet concrete into the mold; c. allowing the poured concrete to at least partially cure; d. releasing the mold from the lower column section; e. raising the mold and positioning the mold at an upper portion of the tower contiguous with the lower portion of the tower; and f. molding an upper column section contiguous with the lower column section.
33 . The method of reinforcing a monopole tower as in claim 30 , wherein forming a concrete reinforcement column further comprises:
a. forming a mold from the bottom of the monopole tower to a desired height of the concrete column; b. pouring concrete into the mold; c. allowing the poured concrete to at least partially cure; and d. releasing the mold from the concrete reinforcement column.
34 . The method of reinforcing a monopole tower as in claim 30 , wherein the concrete reinforcement column formed extending only partially along the entire vertical length of the monopole tower.
35 . The method of reinforcing a monopole tower as in claim 30 , wherein forming a concrete reinforcement column is formed extending the entire vertical length of the monopole tower.
36 . The method of reinforcing a monopole tower as in claim 30 , further comprising molding an antenna support structure into the concrete reinforcement column.
37 . The method of reinforcing a monopole tower as in claim 30 , further comprising attaching to the tower an antenna support structure that is partially embedded in the concrete reinforcement column as the concrete reinforcement column is formed.
38 . The method of reinforcing a monopole tower as in claim 30 , further comprising attaching an antenna support structure by clamping or otherwise to the concrete column after the concrete reinforcement column is formed.
39 . The method of reinforcing a monopole tower as in claim 30 , further comprising attaching an antenna support structure to an un-embedded portion of the monopole tower above the concrete reinforcement column.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.