US2006011105A1PendingUtilityA1
Composition and method for stabilizing road base
Est. expiryJul 16, 2024(expired)· nominal 20-yr term from priority
E01C 3/003C04B 2111/0075C04B 26/26Y10S106/01C04B 26/02Y02W30/91Y10S106/90C04B 2111/00482
37
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A mixture, comprising of fly ash and an emulsion, where said emulsion is mixed with said fly ash in a range of 5% to 50% of fly ash per an area of a square yard and 0.5 gallons to 2.5 gallons per square yard of the emulsion to said area.
Claims
exact text as granted — not AI-modified1 . A mixture, comprising:
fly ash; and an emulsion, where said emulsion is mixed with said fly ash in a range of 5% to 50% of fly ash per an area of a square yard and 0.5 gallons to 2.5 gallons per square yard of the emulsion to said area.
2 . The mixture of claim 1 wherein said mixture is applied as a layer of a stabilized road base.
3 . The mixture of claim 2 wherein said emulsion is of a resin base;
4 . The mixture of claim 2 wherein said emulsion is of an asphalt base.
5 . The mixture of claim 2 wherein said road based includes at least one of dirt, gravel, and sand roads, and wherein said fly ash includes limestone.
6 . The mixture of claim 5 wherein said fly ash includes dry fly ash.
7 . The mixture of claim 5 wherein said fly ash includes coal ash.
8 . The mixture of claim 5 wherein said fly ash includes bottom ash.
9 . A stabilized road base, comprising:
a first layer comprising ash and an emulsion; and a second layer comprising a roadbed.
10 . The road base of claim 9 wherein said first layer is a mixture of at least said ash and said emulsion, and said ash includes ash from coal with limestone.
11 . The road based of claim 9 wherein said first layer includes an ash layer and an emulsion layer.
12 . The road based of claim 10 wherein said ash includes fly ash.
13 . The road based of claim 12 where said roadbed is a tilled roadbed that has been tilled to a depth of at least 4 inches.
14 . The roadbed of claim 13 wherein said first layer is over second layer.
15 . The roadbed of claim 14 wherein said emulsion includes a resin base.
16 . The roadbed of claim 14 wherein said emulsion includes an asphalt base.
17 . A process for stabilizing a road base, comprising:
tilling a roadbed soil; blending in ash; introducing a site specific quantity of an emulsion; and grading and roller compacting said road bases.
18 . The process of claim 17 where said roadbed soil is tilled to a depth of approximately 4-6 inches.
19 . The process of claim 17 wherein approximately 10-25% coal combustion fly ash is blended into said roadbed soil, and said ash including ash from coal with limestone.
20 . The process of claim 19 wherein said roadbed soil is an existing roadbed soil.
21 . A process for stabilizing a road, comprising:
mixing 5% to 50% of dry fly ash per square yard and an of the emulsion to the same area; and applying said mixture to the road.
22 . The process of claim 21 wherein said road includes one of a dirt, gravel, or sand road, and said ash including ash from coal with limestone.
23 . A mixture for deterring insects, the mixture comprising:
ash; and an emulsion.
24 . The mixture of claim 23 , where said ash includes fly ash, wherein a ratio of said mixture is formed with one part fly ash with a sufficient amount of a 50% emulsion to create a mixture consistent with flowable concrete.Join the waitlist — get patent alerts
Track US2006011105A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.