US2009301725A1PendingUtilityA1
Proppant Addition Method and System
Est. expiryJun 6, 2028(~1.9 yrs left)· nominal 20-yr term from priority
Inventors:Leonard R. CaseRoy D. DaussinCalvin L. StegemoellerDavid Mark StriblingBrad Robert BullMatthew Oehler
E21B 43/2605E21B 43/267
40
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A method of injecting a fracturing fluid may include pressurizing a first fluid with clean high-pressure pumps, joining proppant with the pressurized first fluid to form a fracturing fluid, and moving the fracturing fluid to a wellhead and downhole into a formation for fracturing. A pump may pressurize the proppant without the proppant passing therethrough.
Claims
exact text as granted — not AI-modified1 . A method of injecting a fracturing fluid, the method comprising:
pressurizing a first fluid with one or more clean high-pressure pumps; joining proppant with the pressurized first fluid to form the fracturing fluid; and moving the fracturing fluid to a wellhead and downhole into a formation for fracturing; wherein a pump pressurizes the proppant without passing the proppant therethrough.
2 . The method of injecting a fracturing fluid of claim 1 , wherein joining the proppant with the pressurized first fluid comprises allowing a second pressurized fluid to pressurize the proppant.
3 . The method of injecting a fracturing fluid of claim 1 , comprising passing the first fluid through fluid treatment operations prior to pressurizing the first fluid.
4 . The method of injecting a fracturing fluid of claim 1 , comprising adding one or more additives to the first fluid.
5 . The method of injecting a fracturing fluid of claim 4 , wherein adding the additives occurs prior to pressurizing the first fluid.
6 . The method of injecting a fracturing fluid of claim 4 , wherein adding the additives occurs subsequent to pressurizing the first fluid.
7 . A fracturing fluid addition system comprising:
one or more clean high-pressure pumps; a proppant supply; and a fluid supply that provides fluid for the clean high-pressure pumps to pressurize before the fluid joins proppant from the proppant supply; wherein a pump pressurizes the proppant without the proppant passing therethrough.
8 . The fracturing fluid addition system of claim 7 , wherein the fluid supply is a treated fluid supply.
9 . The fracturing fluid addition system of claim 7 , comprising a manifold that transfers the fluid from the fluid supply to the clean high-pressure pumps and from the clean high-pressure pumps to a wellhead.
10 . The fracturing fluid addition system of claim 7 , comprising a chemical supply that provides chemical additives to the pressurized fluid.
11 . The fracturing fluid addition system of claim 7 , wherein the proppant supply comprises a holding tank.
12 . The fracturing fluid addition system of claim 7 , comprising a proppant injection system that pressurizes the proppant before the proppant joins the pressurized fluid.
13 . A method of injecting a fracturing fluid, the method comprising:
beginning a fracturing operation; pressurizing a first fluid with one or more clean high-pressure pumps; joining premixed proppant with the pressurized first fluid to form the fracturing fluid; and moving the fracturing fluid to a wellhead and downhole to a perforated zone for fracturing; wherein the premixed proppant comprises proppant mixed with a liquid prior to the beginning of the fracturing operation.
14 . The method of injecting a fracturing fluid of claim 13 ,
wherein the premixed proppant is mixed at a centralized location remote from the fracturing operation; and wherein the premixed proppant moves from the centralized location to the fracturing operation prior to the beginning of the fracturing operation.
15 . The method of injecting a fracturing fluid of claim 13 , comprising
passing the premixed proppant through one or more dirty high-pressure pumps prior to joining the premixed proppant with the pressurized first fluid.
16 . The method of injecting a fracturing fluid of claim 13 , wherein a pump pressurizes the premixed proppant without the premixed proppant passing therethrough.
17 . The method of injecting a fracturing fluid of claim 13 , comprising adding one or more additives to the first fluid before pressurizing the first fluid.
18 . The method of injecting a fracturing fluid of claim 13 , comprising adding one or more additives to the pressurized first fluid.
19 . The method of injecting a fracturing fluid of claim 13 , wherein the premixed proppant comprises a master blend.
20 . A fracturing fluid addition system comprising:
one or more clean high-pressure pumps; a proppant supply that stores premixed proppant; and a treated fluid supply that provides fluid for the clean high-pressure pumps to pressurize before the fluid joins premixed proppant from the proppant supply; wherein the premixed proppant comprises proppant mixed with a liquid and stored in the proppant supply until the beginning of a fracturing operation.
21 . The fracturing fluid addition system of claim 20 , comprising a manifold that transfers the fluid from the treated fluid supply to the clean high-pressure pumps and from the clean high-pressure pumps to a wellhead.
22 . The fracturing fluid addition system of claim 20 , comprising a chemical supply that provides chemical additives to the pressurized fluid.
23 . The fracturing fluid addition system of claim 20 , wherein the proppant supply comprises a holding tank.
24 . The fracturing fluid addition system of claim 20 , comprising a proppant injection system that pressurizes the proppant before proppant joins the pressurized fluid.Join the waitlist — get patent alerts
Track US2009301725A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.