Method for constructing a chair-type, self-supported earth retaining wall

54
Assignee: LEE JAE HOPriority: Aug 14, 2008Filed: Aug 14, 2009Published: Jun 16, 2011
Est. expiryAug 14, 2028(~2.1 yrs left)· nominal 20-yr term from priority
Inventors:Jae Ho Lee
E02D 5/18E02D 17/08E02D 17/04E02D 2220/00E02D 2600/20
54
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

The present invention provides a method for constructing a chair-type, self-supported earth retaining wall used for retaining external forces such as earth pressure prior to an excavation. The method of the present invention forms a first column of piles having a plurality of piles arranged along the circumference of the region to be excavated. Subsequently, the method comprises forming a second column of piles having a plurality of piles by consecutively perforating a plurality of holes by a predetermined spacing at predetermined positions outwardly from the first column of piles, along the circumference of the region to be excavated, inserting H-beams into the respective holes, filling left and right spaces of the webs of the H-beams with soil, and filling the outer spaces of the flanges of the H-beams with a flowable stiffening material. The method subsequently comprises interconnecting the first column of piles and the second column of piles by a connection member. The first column of piles and the second column of piles are formed along the circumference of the region to be excavated, with an outward spacing, and connected to each other by the connection member. The present invention provides a method for constructing a chair-type, self-supported earth retaining wall used for supporting external forces such as earth pressure prior to an excavation. The method of the present invention comprises forming a first pile array 20 having a plurality of piles 22 arranged along a circumference of an region to be excavated. Subsequently, the method comprises forming a second pile array 30 having a plurality of piles arranged along a circumference of the to-be-excavated region by consecutively drilling a plurality of boreholes 31 at predetermined intervals at predetermined positions outwardly spaced apart from the first pile array, inserting H-beams into the respective boreholes, filling left and right spaces of webs 34 of the H-beams 32 with soil 40 , and filling the outer spaces of flanges 36 of the H-beams with a flowable hardening material 50. The method subsequently comprises fixedly interconnecting the first pile array and the second pile array using a connection member. The first pile array and the second pile array are formed in such a fashion as to be outwardly spaced apart from each other along the circumferences of the to-be-excavated region, and are connected to each other by the connection member to construct an underground earth retaining wall.

Claims

exact text as granted — not AI-modified
1 . A method for constructing a chair-type, self-supported earth retaining wall used for supporting external forces such as earth pressure, the method comprising the steps of:
 forming a first pile array having a plurality of piles arranged along a circumference of an region to be excavated;   forming a second pile array having a plurality of piles arranged along a circumference of the to-be-excavated region by consecutively drilling a plurality of boreholes at predetermined intervals at predetermined positions outwardly spaced apart from the first pile array along the circumference of the to-be-excavated region, inserting H-beams into the respective boreholes, filling left and right spaces of webs of the H-beams with soil, and filling the outer spaces of flanges of the H-beams with a flowable hardening material; and   fixedly interconnecting the first pile array and the second pile array using a connection member,   whereby the first pile array and the second pile array are formed in such a fashion as to be outwardly spaced apart from each other along the circumferences of the to-be-excavated region, and are connected to each other by the connection member to construct an underground earth retaining wall.   
     
     
         2 . The method according to  claim 1 , wherein the plurality of piles of the first pile array is formed by consecutively drilling a plurality of boreholes at predetermined intervals along the circumference of the to-be-excavated region, inserting H-beams into the respective boreholes, filling left and right spaces of webs of the H-beams with soil, and filling the outer spaces of flanges of the H-beams with a flowable hardening material. 
     
     
         3 . The method according to  claim 2 , wherein the plurality of piles of the first pile array is formed of any one selected from the group consisting of H-piles and soil retaining plates, sheet piles, cast-in-place piles, and soil cement walls. 
     
     
         4 . The method according to any one of  claims 1  to  3 , wherein the step of fixedly interconnecting the first pile array and the second pile array using a connection member comprises the following steps of:
 joining a first girth to the plurality of piles constituting the first pile array such that the piles are arranged in parallel with each other on the ground before excavating the ground of the to-be-excavated region; 
 joining a second girth to the plurality of piles constituting the second pile array such that the piles are arranged in parallel with each other; and 
 mounting fixing bars on the first girth and the second girth in such a fashion as to be joined at both ends thereof to the first girth and the second girth. 
 
     
     
         5 . The method according to any one of  claims 1  to  3 , wherein the step of fixedly interconnecting the first pile array and the second pile array using a connection member comprises the following steps of:
 forming a sub-excavation region communicating extending from the second pile array on the ground to the to-be-excavated region during excavation of the to-be-excavated region; 
 joining loggings to the second pile array while forming the sub-excavation region along the second pile array; 
 joining a first girth to the plurality of piles constituting the first pile array such that the piles are arranged in parallel with each other on the ground of the sub-excavation region; 
 joining a second girth to the plurality of piles constituting the second pile array such that the piles are arranged in parallel with each other; 
 mounting fixing bars on the first girth and the second girth in such a fashion as to be joined at both ends thereof to the first girth and the second girth; and 
 joining loggings to the first pile array while forming the to-be-excavated region along the first pile array.