A method for cyclical operation of a coke oven facility which includes an even number of coke oven banks which in turn include an even number of coke oven chambers is shown. Located downstream of the coke oven banks are boiler facilities which drive turbines with the hot waste gases from the coke oven banks. Energy is recovered in this manner. The coke oven chambers are pushed and charged in an exactly determined cycle so that the production of hot waste gas over the temporal mean can be homogenized.

Claims

exact text as granted — not AI-modified
1 - 15 . (canceled) 
     
     
         16 . A method for cyclical operation of a sequence coke oven banks of the “Heat Recovery” type in an even or odd number comprised of at least four coke oven banks, comprising an even or odd number of coke oven chambers, wherein:
 the coke oven banks proper comprise a sequence of at least four coke oven chambers of the “Heat Recovery” type; 
 the coke oven banks are linked to a boiler system in which the heat of hot waste gases from the coke oven banks is utilized to generate steam; and 
 the coke oven chambers are pushed and charged within exactly determined time intervals from the frontal side with a coke pusher machine into the opposite direction of a coke oven chamber, and that directly after pushing a renewed charging of the individual coke oven chambers and a renewed coking cycle are accomplished, the process comprising: 
 in a first pushing cycle the first coke oven chamber of the first coke oven bank is initially pushed and charged, and wherein the first coke oven chamber each of the next but one coke oven bank is consecutively pushed and charged until the first coke oven chamber of the last but one coke oven bank has been pushed and charged, if the number of coke oven chambers per coke oven bank is an even number; and 
 in a succeeding second pushing cycle the next coke oven chamber of the next coke oven bank within this sequence is initially pushed and charged, and wherein then in successive order the coke oven chamber being the same in this sequence of the next but one coke oven bank is pushed and charged until the coke oven chamber being the same in this sequence of the last coke oven bank has been pushed and charged; and 
 in a succeeding third pushing cycle the next but one coke oven chamber in this sequence of the first coke oven bank is pushed and charged, and wherein then in successive order the coke oven chamber being the same in this sequence of the next but one coke oven bank is pushed and charged until the coke oven chamber being the same in this sequence of the last coke oven bank has been pushed and charged; and 
 in a final pushing cycle the coke oven chamber being the last one in this sequence of the first coke oven bank is pushed and charged, and wherein then in successive order the last coke oven chamber each of the next but one coke oven bank is pushed and charged until the coke oven chamber being the last one in this sequence of the last but one coke oven bank has been pushed and charged so that:
 over the temporal mean of all coking cycles a very even production of waste heat can be passed in this manner into the boiler facilities so that the boilers can be supplied very evenly with waste heat. 
 
 
     
     
         17 . A method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks, wherein:
 the coke oven banks proper are comprised of a sequence of at least four coke oven chambers of the “Heat Recovery” type;   the coke oven banks are linked to a boiler system in which the heat of hot waste gases from coke oven banks is utilized to generate steam so that exactly half the number of boiler systems is provided; and   the coke oven chambers are pushed and charged within exactly determined time intervals from the frontal side with a coke pusher machine into the opposite direction of a coke oven chamber, and that directly after pushing a renewed charging of the individual coke oven chambers and a renewed coking cycle are accomplished, comprising :   pushing and charging, in a first pushing cycle, the first coke oven chamber of the first coke oven bank and the first coke oven chamber each of the next but one coke oven bank is consecutively pushed and charged until the first coke oven chamber of the last but one coke oven bank has been pushed and charged, if the number of coke oven chambers per coke oven bank is an even number; and   pushing and charging in a succeeding pushing cycle the first coke oven chamber of the next coke oven bank, and wherein then in successive order the first coke oven chamber each of the next but one coke oven bank is pushed and charged until the first coke oven chamber of the last coke oven bank has been pushed and charged, and   pushing and charging in a succeeding pushing cycle the coke oven chamber being the next one in this sequence of the first coke oven bank, and then in successive order the coke oven chamber each being the same in this sequence of the next but one coke oven bank is pushed and charged until the coke oven chamber being the next one in this sequence of the last coke oven bank has been pushed and charged; and   pushing and charging in a final pushing cycle the coke oven chamber being the last one in this sequence of the coke oven bank, and wherein then in successive order the last coke oven chamber each of the next but one coke oven bank is pushed and charged until the coke oven chamber being the last one in this sequence of the last coke oven bank has been pushed and charged; so that
 over the temporal mean of all coking cycles a very even production of waste heat can be passed in this manner into the boiler facilities so that the boilers can be supplied very evenly with waste heat. 
   
     
     
         18 . A method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks, wherein
 the coke oven banks proper are comprised of a sequence of at least four coke oven chambers of the “Heat Recovery” type;   the coke oven banks are linked to a boiler system in which the heat of hot waste gases from coke oven banks is utilized to generate steam so that exactly half the number of boiler systems is provided; and   the coke oven chambers are pushed and charged within exactly determined time intervals from the frontal side with a coke pusher machine into the opposite direction of a coke oven chamber, and that directly after pushing a renewed charging of the individual coke oven chambers and a renewed coking cycle are accomplished, comprising:   in a first pushing cycle the first coke oven chamber of the first coke oven bank is initially pushed and charged, and wherein the first coke oven chamber each of the next coke oven bank is consecutively pushed and charged until the first coke oven chamber of the last coke oven bank has been pushed and charged, if the number of coke oven chambers per coke oven bank is an even number;   in a succeeding pushing cycle the next but one coke oven chamber of the next coke oven bank within this sequence is initially pushed and charged, and wherein then in successive order the coke oven chamber being the same in this sequence of the next coke oven bank is pushed and charged until the coke oven chamber being the same in this sequence of the last coke oven bank has been pushed and charged; and   in a final pushing cycle the last coke oven chamber of the first coke oven bank is pushed and charged, and wherein then in successive order the coke oven chamber being the last one each within this sequence of the next coke oven bank is pushed and charged until the last coke oven chamber of the last coke oven bank has been pushed and charged; such that
 over the temporal mean of all coking cycles a very even production of waste heat can be passed in this manner into the boiler facilities so that the boilers can be supplied very evenly with waste heat. 
   
     
     
         19 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 16 , wherein the hot steam from the boiler systems is utilized to drive a turbine and to generate electricity. 
     
     
         20 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 19 , wherein the hot waste gases are passed to a desulphurization stage after they have left the boiler system. 
     
     
         21 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 20 , wherein the device for desulphurization is a gas scrubbing unit. 
     
     
         22 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 16 , wherein the hot coke is passed into a coke quenching car after pushing, said coke quenching car being able to approach the single coke oven chambers individually for coke pushing. 
     
     
         23 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 22 , wherein the hot coke from the coke quenching car is passed into a facility suitable for coke quenching, this being for example a coke quenching tower. 
     
     
         24 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 23 , wherein the hot coke from the coke quenching car is passed into a facility suitable for coke quenching, this being for example a coke dry quenching facility. 
     
     
         25 . The method for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 16 , wherein the individual coke oven chamber ovens are charged by a coal charging machine that can approach the single coke oven chambers individually. 
     
     
         26 . A device for cyclical operation of a sequence of an even or odd number of at least four coke oven banks in accordance to the method of  claim 16 , wherein the number of coke oven chambers per coke oven bank ranges between six and thirty-four. 
     
     
         27 . The device for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 26 , wherein the number of coke oven chambers per coke oven bank amounts to exactly fourteen. 
     
     
         28 . The device for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 26 , wherein each coke oven bank is linked to one boiler. 
     
     
         29 . The device for cyclical operation of a sequence of an even number of at least four coke oven banks as defined in  claim 26 , wherein the number of coke oven banks per boiler amounts to two, so that the boilers are linked in pairs to the coke oven banks. 
     
     
         30 . The device for cyclical operation of a sequence of an even or odd number of at least four coke oven banks as defined in  claim 26 , wherein there are at least 6 coke oven banks, and that the number of coke oven banks per boiler amounts to three.

Join the waitlist — get patent alerts

Track US2011253521A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.