US2012125602A1PendingUtilityA1

Monitoring Injected Nonhydrocarbon And Nonaqueous Fluids Through Downhole Fluid Analysis

46
Assignee: DUBOST FRANCOISPriority: Jun 1, 2006Filed: Oct 10, 2011Published: May 24, 2012
Est. expiryJun 1, 2026(expired)· nominal 20-yr term from priority
E21B 49/087Y02C20/40E21B 41/0064
46
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A method of monitoring a nonhydrocarbon and nonaqueous fluid injected into the earth's subsurface through a first wellbore that involves positioning a fluid analysis tool within a second wellbore and determining the presence of the injected nonhydrocarbon and nonaqueous fluid by making a measurement downhole on the injected nonhydrocarbon and nonaqueous fluid using the fluid analysis tool. Also a related method of enhancing hydrocarbon production from a subsurface area having first and second wellbores that involves injecting a nonhydrocarbon and nonaqueous fluid into the subsurface through the first wellbore, positioning a fluid analysis tool within the second wellbore, and determining the presence of the injected nonhydrocarbon and nonaqueous fluid by making a measurement downhole on the injected nonhydrocarbon and nonaqueous fluid using the fluid analysis tool.

Claims

exact text as granted — not AI-modified
1 . A method of enhancing hydrocarbon production from a subsurface area having first and second wellbores comprising:
 injecting a nonhydrocarbon and nonaqueous fluid into the subsurface through said first wellbore;   positioning a fluid analysis tool within said second wellbore;   determining the presence of said injected nonhydrocarbon and nonaqueous fluid by determining fluid properties of said injected nonhydrocarbon and nonaqueous fluid using said fluid analysis tool; and   identifying a location within said second wellbore where fluids with relatively high concentrations of said injected nonhydrocarbon and nonaqueous fluid are entering said second wellbore.   
     
     
         2 . A method of enhancing hydrocarbon production from a subsurface area in accordance with  claim 1 , further comprising performing a treatment on said second wellbore. 
     
     
         3 . A method of enhancing hydrocarbon production from a subsurface area in accordance with  claim 2 , wherein said treatment inhibits fluid from entering said second wellbore at said identified location and flowing to the surface comprises installing one or more of a bridge plug, a packer, a casing patch, gel, or cement within said second wellbore. 
     
     
         4 . A method of enhancing hydrocarbon production from a subsurface area in accordance with  claim 2 , wherein said treatment enhances the production of fluid entering the wellbore from areas other than the identified location. 
     
     
         5 . A method of enhancing hydrocarbon production from a subsurface area in accordance with  claim 1 , further comprising modifying the rate at which fluid is being withdrawn from said second wellbore. 
     
     
         6 . A method of monitoring a nonhydrocarbon and nonaqueous fluid injected into the earth's subsurface through a first wellbore comprising:
 positioning a fluid analysis tool within a second wellbore;   determining the presence of said injected nonhydrocarbon and nonaqueous fluid by determining fluid properties of said injected nonhydrocarbon and nonaqueous fluid using said fluid analysis tool;   repositioning said fluid analysis tool at a different location within said second wellbore,   determining the presence of said injected nonhydrocarbon and nonaqueous fluid at said different location by making a measurement downhole on said injected nonhydrocarbon and nonaqueous fluid using said fluid analysis tool, and   comparing the measurements made at said different locations.   
     
     
         7 . A method of monitoring a nonhydrocarbon and nonaqueous fluid injected into the earth's subsurface through a first wellbore comprising:
 positioning a fluid analysis tool within a second wellbore; and   determining the presence of said injected nonhydrocarbon and nonaqueous fluid by making a measurement downhole comprising determining fluid properties of said injected nonhydrocarbon and nonaqueous fluid using said fluid analysis tool.

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.