US2012292108A1PendingUtilityA1

Mobile pressure optimization unit for drilling operations

42
Assignee: LOVORN JAMES RPriority: May 16, 2011Filed: Feb 28, 2012Published: Nov 22, 2012
Est. expiryMay 16, 2031(~4.8 yrs left)· nominal 20-yr term from priority
E21B 2200/22E21B 21/08
42
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A well drilling method can include transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, and a flowmeter which measures flow of drilling fluid through the choke manifold, and then interconnecting the pressure optimization unit to rig drilling equipment. A pressure optimization unit for use with a well drilling system can include a choke manifold, a control system which automatically controls operation of the choke manifold, and a flowmeter which measures flow of drilling fluid through the choke manifold. The choke manifold, control system and flowmeter may be incorporated into a same conveyance which transports the pressure optimization unit to a rig site.

Claims

exact text as granted — not AI-modified
1 - 6 . (canceled) 
     
     
         7 . A well drilling method, comprising:
 transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a flow diverter which diverts flow of the drilling fluid from a standpipe to the choke manifold; and   then interconnecting the pressure optimization unit to rig drilling equipment.   
     
     
         8 . A well drilling method, comprising:
 transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a backpressure pump which pressurizes a well annulus; and   then interconnecting the pressure optimization unit to rig drilling equipment.   
     
     
         9 . A well drilling method, comprising:
 transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a fluid analysis system which comprises a gas analysis system; and   then interconnecting the pressure optimization unit to rig drilling equipment.   
     
     
         10 . A well drilling method, comprising:
 transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a fluid analysis system which comprises a rheology measurement system; and   then interconnecting the pressure optimization unit to rig drilling equipment.   
     
     
         11 . A well drilling method, comprising:
 transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a rotating control device clamp control; and   then interconnecting the pressure optimization unit to rig drilling equipment.   
     
     
         12 . A well drilling method, comprising:
 transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a rotating control device lubricant supply; and   then interconnecting the pressure optimization unit to rig drilling equipment.   
     
     
         13 - 24 . (canceled)

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.