Mobile pressure optimization unit for drilling operations
Abstract
A well drilling method can include transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, and a flowmeter which measures flow of drilling fluid through the choke manifold, and then interconnecting the pressure optimization unit to rig drilling equipment. A pressure optimization unit for use with a well drilling system can include a choke manifold, a control system which automatically controls operation of the choke manifold, and a flowmeter which measures flow of drilling fluid through the choke manifold. The choke manifold, control system and flowmeter may be incorporated into a same conveyance which transports the pressure optimization unit to a rig site.
Claims
exact text as granted — not AI-modified1 - 6 . (canceled)
7 . A well drilling method, comprising:
transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a flow diverter which diverts flow of the drilling fluid from a standpipe to the choke manifold; and then interconnecting the pressure optimization unit to rig drilling equipment.
8 . A well drilling method, comprising:
transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a backpressure pump which pressurizes a well annulus; and then interconnecting the pressure optimization unit to rig drilling equipment.
9 . A well drilling method, comprising:
transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a fluid analysis system which comprises a gas analysis system; and then interconnecting the pressure optimization unit to rig drilling equipment.
10 . A well drilling method, comprising:
transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a fluid analysis system which comprises a rheology measurement system; and then interconnecting the pressure optimization unit to rig drilling equipment.
11 . A well drilling method, comprising:
transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a rotating control device clamp control; and then interconnecting the pressure optimization unit to rig drilling equipment.
12 . A well drilling method, comprising:
transporting a pressure optimization unit to a rig site, the pressure optimization unit including a choke manifold, a control system which automatically controls operation of the choke manifold, a flowmeter which measures flow of drilling fluid through the choke manifold, and a rotating control device lubricant supply; and then interconnecting the pressure optimization unit to rig drilling equipment.
13 - 24 . (canceled)Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.