US2013056214A1PendingUtilityA1
Reducing sulfide in production fluids during oil recovery
Individually held — no corporate assignee on recordPriority: Sep 7, 2011Filed: Sep 7, 2011Published: Mar 7, 2013
Est. expirySep 7, 2031(~5.1 yrs left)· nominal 20-yr term from priority
B01D 53/1468B01D 2251/106B01D 53/52E21B 43/16C09K 8/532B01D 2251/95E21B 21/062B01D 2251/108
44
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
Methods are provided for treating production fluid in a production well in an oil reservoir to reduce the amount of sulfide in the production fluid. The production fluid is treated with nitrate and/or nitrite ions in an aqueous solution that is added to the well casing.
Claims
exact text as granted — not AI-modified1 . A method for treating production fluid in an oil production well comprising:
a) providing an oil production well in an oil reservoir having a well casing and a production pipe; b) adding an aqueous solution comprising at least one oxidant to the well casing wherein said solution flows down the well casing and contacts production fluid in the well bore below the production pipe; and c) producing the production fluid through the production pipe; wherein the sulfide concentration in the production fluid is reduced as compared to the sulfide concentration in production fluid obtained with omission of step (b).
2 . The method of claim 1 wherein the aqueous solution comprises an oxidant selected from the group consisting of nitrite, chlorine dioxide, hypochlorite, persulfate, peracetic acid, and hydrogen peroxide.
3 . The method of claim 1 wherein the aqueous solution comprises nitrate ions, nitrite ions, or a mixture of nitrate and nitrite ions.
4 . The method of claim 3 wherein the total molar concentration of nitrate ions, nitrite ions, or the mixture of nitrate and nitrite ions is at least about five-fold higher than the molar concentration of sulfide in production fluid of the production well measured prior to addition of the aqueous solution of (b).
5 . The method of claim 3 wherein at least a portion of nitrate ions are reduced to nitrite ions in the production fluid mixture by nitrate reducing bacteria.
6 . The method of claim 1 wherein the oil production well of (a) is a single well oil recovery system or in a multiple well oil recovery system.
7 . The method of claim 1 wherein prior to step (b) the oil reservoir is injected with a nutrient solution and optionally with at least one microorganism.
8 . The method of claim 1 wherein the aqueous solution of (b) is combined with power water added to the well casing.
9 . The method of claim 1 wherein adding the aqueous solution to the well casing in (b) is intermittent or continuous, starting prior to producing from the well.
10 . The method of claim 1 wherein the oil production well has a delivery tubing in side the well casing and outside of the production pipe, and the aqueous solution of (b) is added to the delivery tubing.
11 . The method of claim 3 wherein the aqueous solution comprises nitrite ions.
12 . The method of claim 11 wherein the aqueous solution comprises nitrite ions and omits nitrate ions.Join the waitlist — get patent alerts
Track US2013056214A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.