US2013061719A1PendingUtilityA1

Production of metal products directly from underground ore deposits

Assignee: COOPERATIVE MINERAL RESOURCES LLCPriority: Jan 27, 2009Filed: Nov 12, 2012Published: Mar 14, 2013
Est. expiryJan 27, 2029(~2.5 yrs left)· nominal 20-yr term from priority
C22B 1/00C22B 3/00Y02P10/20C22B 3/04C25C 1/10E21B 43/29C22B 5/00C22B 47/00C22B 3/08
53
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A process for producing metal compounds directly from underground mineral deposits including steps of forming a borehole at a site into a mineral deposit containing metal compounds, inserting a slurry-forming device having a nozzle into the borehole adapted to direct pressurized water through the nozzle into the mineral deposit, supplying pressured water through the nozzle into the mineral deposit forming a mineral slurry containing metal compounds, extracting the mineral slurry containing metal compounds through the borehole, leaching the mineral slurry converting the metal compounds to a soluble form in a leach solution, and removing metals and metal compounds by treating the leach solution with an extraction treatment removing the metal products. Steps of leaching the mineral slurry and removing metal products are performed at a location remote from the borehole site. In one alternative, the step of removing metal products from mineral slurry is accomplished by pyrometallurgical processes.

Claims

exact text as granted — not AI-modified
1 . A process for producing metal compounds directly from underground mineral deposits in an environmentally sensitive area comprising the steps of:
 (a) forming a borehole from an accessible site into an underground mineral deposit containing metal compounds including oxides of manganese beneath the environmentally sensitive area;   (b) inserting a slurry-forming device having a nozzle into the borehole adapted to direct pressurized water through the nozzle into the mineral deposit under the environmentally sensitive area;   (c) supplying pressured water through the nozzle of the slurry-forming device into the mineral deposit forming a mineral slurry containing the metal compounds from the mineral deposit under the environmentally sensitive area;   (d) extracting and dewatering the mineral slurry containing the metal compounds through the borehole in the environmentally sensitive area;   (e) transporting the dewatered mineral slurry as extracted from the mineral deposit away from the borehole to a location remote from the environmentally sensitive area;   (f) leaching the extracted mineral slurry at the remote location to convert the metal compound to a soluble form in a leach solution; and   (g) removing metal compounds by treating the leach solution with an extraction treatment adapted to remove the metal compounds.   
     
     
         2 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1 , where the mineral slurry is transported by a device selected from a group consisting of truck, rail, pipeline, and a combination of two or more thereof. 
     
     
         3 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  further comprising the step of:
 prior to the step of leaching the mineral slurry, grinding particulate in the mineral slurry to a particle size of about 80% smaller than 100 mesh. 
 
     
     
         4 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  further comprising the step of:
 prior to the step of leaching the mineral slurry, grinding particulate in the mineral slurry to a particle size of about 80% smaller than 200 mesh. 
 
     
     
         5 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1 , further comprising the step of:
 after the step of leaching the mineral slurry, treating the leach solution with one or more treatments to remove selected metals and metal compounds.   
     
     
         6 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  where the step of leaching the mineral slurry comprises leaching the mineral slurry to put desired metal compounds into solution. 
     
     
         7 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  where the step of leaching the mineral slurry comprises leaching the mineral slurry with sulfurous acid. 
     
     
         8 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  where the leach solution comprises at least one reducing agent selected from a group consisting of SO 2 , carbon, reducing sugar, molasses, and a combination of two or more thereof. 
     
     
         9 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  where the leach solution has a pH of 3 or lower. 
     
     
         10 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  further comprising the step of:
 prior to the step of removing metal compounds, chemically treating the leach solution with oxidizing agents producing metal compounds. 
 
     
     
         11 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  further comprising the step of:
 prior to the step of removing metal compounds, chemically treating the leach solution with reducing agents producing selected metal products. 
 
     
     
         12 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  where the step of removing metal compounds comprises electrochemically treating the leach solution removing selected metals or metal compounds. 
     
     
         13 . The process for producing metal compounds directly from underground mineral deposits according to  claim 1  further comprising
 forming a second slanted borehole in the environmentally sensitive area intersecting the first borehole in the mineral deposit containing metal compounds including oxides of manganese; 
 where the step of inserting a slurry-forming device is into the second borehole, and where the step of extracting is through the first borehole. 
 
     
     
         14 . A process for producing metal compounds directly from underground mineral deposits in an environmentally sensitive area comprising the steps of:
 (a) forming a borehole from an accessible site into an underground mineral deposit containing metal compounds including oxides of manganese beneath the environmentally sensitive area;   (b) inserting a slurry-forming device having a nozzle into the borehole adapted to direct pressurized water through the nozzle into the mineral deposit under the environmentally sensitive area;   (c) supplying pressured water through the nozzle of the slurry-forming device into the mineral deposit forming a mineral slurry containing the metal compounds from the mineral deposit under the environmentally sensitive area;   (d) extracting and dewatering the mineral slurry containing the metal compounds through the borehole in the environmentally sensitive area;   (e) transporting the dewatered mineral slurry as extracted from the mineral deposit away from the borehole to a location remote from the environmentally sensitive area;   (f) physically separating the extracted mineral slurry at the remote location; and   (g) removing metal compounds by treating the mineral slurry by a pyrometallurgical extraction treatment adapted to remove the metal compounds.   
     
     
         15 . The process for producing metal compounds directly from underground mineral deposits according to  claim 14 , where the mineral slurry is transported by a device selected from a group consisting of truck, rail, pipeline, and a combination of two or more thereof. 
     
     
         16 . The process for producing metal compounds directly from underground mineral deposits according to  claim 14  further comprising the step of:
 prior to the step of physically separating the mineral slurry, grinding particulate in the mineral slurry to a particle size of about 80% smaller than 100 mesh. 
 
     
     
         17 . The process for producing metal compounds directly from underground mineral deposits according to  claim 14 , further comprising the step of:
 after the step of physically separating the mineral slurry, mixing the mineral slurry with at least one reducing agent selected from a group consisting of coal, coke, coke-breeze, char, reducing sugar, molasses, and a combination of two or more thereof.   
     
     
         18 . The process for producing metal compounds directly from underground mineral deposits according to  claim 14 , further comprising the step of:
 after the step of physically separating the mineral slurry, mixing the mineral slurry with at least one additive selected from a group consisting of calcium oxide, limestone, soda ash, Na 2 CO 3 , NaHCO 3 , NaOH, borax, NaF, fluorspar, CaF 2 , aluminum smelting industry slag and a combination of two or more thereof.   
     
     
         19 . The process for producing metal compounds directly from underground mineral deposits according to  claim 14 , where the step of removing metal compounds is performed in a rotary hearth furnace in a reducing atmosphere.

Join the waitlist — get patent alerts

Track US2013061719A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.