Building with temperature regulating system and temperature regulating method thereof
Abstract
A building with temperature regulating system comprises a main construction, a working platform, a first water wall, an air passage and a first fan. The main construction has a bottom surface and a first side wall and a second side wall disposed on two opposite sides of the bottom surface respectively, the first side wall has a penetrated air passage. The first water wall is disposed on the first side wall, and the air passage is disposed below the first water wall. The working platform is disposed inside the main construction and it has a supporting surface, a maximum height between the air passage and the bottom surface is smaller than a height between the supporting surface and the bottom surface. The first fan is disposed on the second side wall, and an air generated by the first fan is corresponding to the working platform.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A temperature regulating method of a building, including steps of:
a building being provided, and an upper temperature limit and a lower temperature limit being defined, the building comprising:
a main construction having a first side wall and a second side wall disposed oppositely to each other, the first side wall having a first water wall and an air passage disposed below the first water wall, the second side wall having a first fan; and
a working platform disposed inside the main construction, the working platform being higher than the air passage; and
whether the first fan needs to be turned on and the air passage needs to be opened being determined according to a temperature inside the main construction and a temperature outside the main construction for carrying out ventilation and temperature reduction.
2 . The temperature regulating method of the building as claimed in claim 1 , wherein the step of whether the first fan needs to be turned on and the air passage needs be opened being determined according to temperatures inside and outside the main construction for carrying out ventilation and temperature reduction further includes:
whether a temperature inside the main construction is higher than or equal to the upper temperature limit being determined; if yes, whether a temperature outside the main construction is lower than the lower temperature limit being determined; and if yes, the first fan being turned on and the air passage being opened for making an air passes through below the working platform to carry out ventilation and temperature reduction.
3 . The temperature regulating method of the building as claimed in claim 2 , further comprising a first temperature sensor and a second temperature sensor both of which are disposed on the working platform, the first temperature sensor being nearer to the first side wall than the second temperature sensor, a temperature inside the main construction being detected by the first temperature sensor or the second temperature sensor, the steps of the temperature regulating method of the building further comprising whether a temperature detected by the first temperature sensor is lower than the lower temperature limit being determined, if yes, a rotating speed of the first fan being reduced.
4 . The temperature regulating method of the building as claimed in claim 2 , wherein a first temperature sensor and a second temperature sensor are disposed on the working platform, the first temperature sensor is nearer to the first side wall than the second temperature sensor, a temperature inside the main construction is detected by the first temperature sensor or the second temperature sensor, a heating device is further disposed in the air passage, the steps of the temperature regulating method of the building further comprises whether a temperature detected by the first temperature sensor is lower than the lower temperature limit being determined, if yes, the heater being turned on.
5 . The temperature regulating method of the building as claimed in claim 1 , wherein the building with temperature regulating system further includes a third temperature sensor disposing outside the main construction for detecting a temperature outside the main construction.
6 . The temperature regulating method of the building as claimed in claim 1 , wherein a second fan is disposed on the second side wall and the second fan is above the first fan, and the step of whether the first fan needs to be turned on and the air passage needs be opened being determined according to temperatures inside and outside the main construction for carrying out ventilation and temperature reduction further comprises:
whether a temperature inside the main construction is higher than or equal to the upper temperature limit being determined; if yes, whether a temperature outside the main construction is lower than the lower temperature limit being determined; if no, whether a temperature outside the main construction is lower than the upper temperature limit being determined; and if yes, the first water wall being opened and the second fan being turned on for making an air passes through above the working platform to carry out ventilation and temperature reduction.
7 . The temperature regulating method of the building as claimed in claim 6 , wherein a second water wall is further disposed on the first side wall, and is between the first water wall and the air passage, the temperature regulating method of the building further comprises, after ventilation and temperature reduction are carried out by the second fan and the first water wall for a time interval, if a temperature inside the main construction is still higher than or equal to the upper temperature limit, the second water wall being opened.
8 . The temperature regulating method of the building as claimed in claim 1 , wherein a second fan is further disposed on the second side wall and the second fan is above the first fan, and the step of whether the first fan needs to be turned on and the air passage needs to be opened being determined according to temperatures inside and outside the main construction for carrying out ventilation and temperature reduction further includes:
whether a temperature inside the main construction is higher than or equal to the upper temperature limit being determined; if yes, whether a temperature outside the main construction is lower than the lower temperature limit being determined; if no, whether a temperature outside the main construction is lower than the upper temperature limit being determined; and if no, the first water wall being opened and the second fan being turned on, and water being configured to flow down on the first water wall to moisten the first water wall, so that an air passes through above the working platform to carry out ventilation and temperature reduction.
9 . The temperature regulating method of the building as claimed in claim 8 , wherein a second water wall is further disposed on the first side wall, and is between the first water wall and the air passage, the steps of the temperature regulating method of the building further comprises, after ventilation and temperature reduction are carried out by the second fan and the first water wall for a time interval, if a temperature inside the main construction is still higher than or equal to the upper temperature limit, the second water wall being opened and water being configured to flow down on the second water wall to moisten the second water wall.
10 . A building with temperature regulating system, comprising:
a main construction having a bottom surface as well as a first side wall and a second side wall disposed on two opposite sides of the bottom surface respectively, the first side wall having a penetrated air passage; a first water wall disposed on the first side wall, the air passage being disposed below the first water wall; a working platform disposed inside the main construction and the working platform having a supporting surface, a maximum height between the air passage and the bottom surface being smaller than a height between the supporting surface and the bottom surface; and a first fan disposed on the second side wall, an air generated by the first fan being corresponded to the working platform.
11 . The building with temperature regulating system as claimed in claim 10 , further comprising a second water wall disposed on the first side wall and being disposed between the first water wall and the air passage.
12 . The building with temperature regulating system as claimed in claim 10 , further comprising a second fan disposed on the second side wall and above the first fan.
13 . The building with temperature regulating system as claimed in claim 10 , further comprising a heater disposed in the air passage.
14 . The building with temperature regulating system as claimed in claim 10 , further comprising a first temperature sensor and a second temperature sensor disposed on the working platform, and the first temperature sensor being nearer to the first side wall than the second temperature sensor.
15 . The building with temperature regulating system as claimed in claim 10 , further comprising a third temperature sensor disposed outside the main construction.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.