US2013199787A1PendingUtilityA1
Method and System for Fracture Stimulation
Est. expiryOct 27, 2030(~4.3 yrs left)· nominal 20-yr term from priority
G06F 30/20E21B 43/263E21B 43/30E21B 43/305E21B 43/26
44
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
The present techniques provide systems and methods for fracturing a production formation. A method includes creating a notch in a formation and causing a volumetric change in a treatment interval proximate to a production interval so as to apply a mechanical stress on the production interval, wherein the treatment interval, the production interval, or both are located within the formation. A horizontal fracture is created in the formation originating from the notch.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method for fracturing a production formation, comprising:
creating a notch in a formation; causing a volumetric change in a treatment interval proximate to a production interval so as to apply a mechanical stress on the production interval, wherein the treatment interval, the production interval, or both are located within the formation; and creating a horizontal fracture in the formation originating from the notch.
2 . The method of claim 1 , comprising creating a fracture field in the production interval from the mechanical stress.
3 . The method of claim 1 , comprising creating the notch in the treatment interval.
4 . The method of claim 1 , comprising creating the notch in the production interval.
5 . The method of claim 4 , comprising creating the horizontal fracture in the production interval to couple a fracture field to a production well.
6 . The method of claim 1 , wherein both the treatment interval and the production interval are located in a reservoir.
7 . The method of claim 1 , wherein only the production interval is located in a reservoir.
8 . The method of claim 1 , comprising repeating the volumetric change for one or more cycles to cause rubblization along a delamination fracture.
9 . The method of claim 1 , comprising:
pumping a higher viscosity fluid to sustain an initial fracture; and pumping a lower viscosity fluid to create or open secondary fractures.
10 . The method of claim 1 , comprising:
creating a plurality of notches in the treatment interval; and fracturing the treatment interval sequentially at each of the plurality of notches to create a volumetric increase in the treatment interval.
11 . The method of claim 10 , comprising fracturing the plurality of notches in a sequence from a lowest notch to a highest notch.
12 . The method of claim 1 , comprising
drilling a deviated well through the treatment interval and the production interval; stimulating the treatment interval through the deviated well; and producing hydrocarbons from the production interval through the deviated well.
13 . The method of claim 12 , comprising:
drilling a well comprising a plurality of deviated branches through the treatment interval and the production interval; stimulating the treatment interval through the plurality of deviated branches; and producing hydrocarbons from the production interval through the plurality of deviated branches.
14 . The method of claim 1 , comprising:
creating a plurality of notches in the treatment interval; and fracturing the treatment interval substantially simultaneously at each of the plurality of notches to create a volumetric increase in the treatment interval.
15 . The method of claim 1 , comprising pumping a fracturing fluid into the treatment interval to cause the volumetric change.
16 . The method of claim 1 , comprising thermally expanding the treatment interval to cause the volumetric change.
17 . The method of claim 1 , comprising expanding the treatment interval with explosives to cause the volumetric change.
18 . The method of claim 1 , comprising producing hydrocarbon from the production interval.
19 . A method for production of a hydrocarbon from a reservoir, comprising:
expanding a treatment interval below a production interval to mechanically stress the production interval; creating a fracture field to enhance conductivity within the production interval; creating a notch in the production interval; fracturing the production interval at the notch to form a horizontal fracture coupling the fracture field to a production well; and producing hydrocarbon from the production interval.
20 . The method of claim 19 , comprising:
creating a notch in the treatment interval; and fracturing the treatment interval at the notch to create a horizontal fracture.
21 . The method of claim 19 , comprising:
creating a plurality of notches in the treatment interval; and fracturing the treatment interval at the plurality of notches to created an uplifted fractured field.
22 . A hydrocarbon production system, comprising:
a production interval in a hydrocarbon bearing subterranean formation; a treatment interval proximate to the production interval; a stimulation well drilled to the treatment interval; a production well drilled to the production interval; a notching system configured to create notches in a formation comprising the production interval, the treatment interval, or both; a stimulation system configured to create a volumetric change in the treatment interval; and a fracturing system configured to fracture the formation at the notches to create horizontal fractures.
23 . The hydrocarbon production system of claim 22 , wherein the production interval comprises a tight gas layer.
24 . The hydrocarbon production system of claim 22 , wherein the treatment interval comprises a layer in an underburden.
25 . The hydrocarbon production system of claim 22 , comprising a fracture field created by mechanical stress induced by the volumetric change in the treatment interval.
26 . The hydrocarbon production system of claim 22 , wherein the production well and stimulation well are portions of a single deviated or vertical wellbore.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.