US2013269453A1PendingUtilityA1
Method and system for determining structural changes in a longwall mine
Assignee: Cut Coal Technology Holdings Pty LtdPriority: Mar 27, 2012Filed: Mar 26, 2013Published: Oct 17, 2013
Est. expiryMar 27, 2032(~5.7 yrs left)· nominal 20-yr term from priority
Inventors:Campbell Robert Morrison
E21F 17/02E21F 17/18
40
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A system for determining structural changes in a longwall mine, including a modulator wheel operatively coupled to a longwall mining machine, and a controller in communication with the modulator wheel; wherein the controller determines a movement of the longwall mining machine according to a signal received from the modulator wheel.
Claims
exact text as granted — not AI-modified1 . A system for determining structural changes in a longwall mine, including:
a modulator wheel operatively coupled to a longwall mining machine; and a controller in communication with the modulator wheel; wherein the controller determines a movement of the longwall mining machine according to a signal received from the modulator wheel.
2 . The system of claim 1 wherein the modulator wheel is an optical modulator wheel.
3 . The system of claim 1 wherein the modulator wheel is an electrical modulator wheel.
4 . The system of claim 1 wherein the controller is in optical communication with the modulator wheel.
5 . The system of claim 1 wherein the controller is in electrical communication with the modulator wheel.
6 . The system of claim 1 wherein the modulator wheel frictionally engages with a rail of a monorail system supplying services to the longwall mining machine.
7 . The system of claim 1 wherein the modulator wheel is mounted to an arm.
8 . The system of claim 7 wherein the arm is mounted to an end carriage of the monorail system.
9 . The system of claim 1 wherein an optical fibre connects the controller to the modulator wheel.
10 . The system of claim 1 wherein the controller is connected to a local area network.
11 . A method of determining structural changes in a longwall mine including the steps of:
measuring a signal received from a modulator wheel, the modulator wheel operatively coupled to a longwall mining machine; and communicating the signal to a controller;
wherein the controller determines a movement of the longwall mining machine according to the signal.
12 . The method of claim 11 wherein the modulator wheel is an optical modulator wheel.
13 . The method of claim 11 wherein the modulator wheel is an electrical modulator wheel.
14 . The method of claim 11 wherein the controller is in optical communication with the modulator wheel.
15 . The method of claim 11 wherein the controller is in electrical communication with the modulator wheel.
16 . The method of dam 11 wherein the modulator wheel frictionally engages with a rail of a monorail system supplying services to the longwall mining machine.
17 . The method of claim 11 wherein the modulator wheel is mounted to an arm.
18 . The method of claim 17 wherein the arm is mounted to an end carriage of the monorail system.
19 . The method of dam 11 wherein an optical fibre connects the controller to the modulator wheel.
20 . A system for determining structural changes in a longwall mine, including:
a modulator wheel for frictionally engaging with a rail of a monorail system, the monorail system for supplying services to a longwall mining machine; and a controller in communication with the modulator wheel; wherein a distance moved by the longwall mining machine is determined according to a signal received by the controller from the modulator wheel.Join the waitlist — get patent alerts
Track US2013269453A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.