US2014003868A1PendingUtilityA1
Method and Apparatus for Casting a Concrete Pile in the Ground
Est. expiryJun 27, 2032(~5.9 yrs left)· nominal 20-yr term from priority
Inventors:Tyler Dewitt
E02D 5/66
40
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A concrete pile is cast in the ground by driving a plate into the earth with a tubular mandrel to create a shaft. Fluid grout injected into the mandrel can flow from the mandrel to fill the shaft. The plate is tethered to the mandrel and is recoverable for reuse when the mandrel is withdrawn from the grout filled shaft.
Claims
exact text as granted — not AI-modified1 . An apparatus for creating a shaft in earth, said apparatus comprising:
(a) a plate; (b) an elongate tubular mandrel having an end bearably engageable with a first surface of said plate, said mandrel arranged to urge said plate into the earth; and (c) a tether attached proximate a periphery of said first surface of said plate and affixed to said mandrel proximate a central longitudinal axis of said mandrel and arranged to support said plate with said first surface and a spaced apart second surface aligned approximately parallel to and spaced approximately equal distances from said longitudinal axis of said mandrel when lifted by said mandrel.
2 . (canceled)
3 . The apparatus of claim 1 wherein said tether comprises a flexible member.
4 . The apparatus of claim 1 wherein said tether comprises a chain.
5 . The apparatus of claim 1 further comprising a pin secured to said mandrel and arranged substantially normal to said longitudinal axis of said mandrel, said tether secured to said pin.
6 . The apparatus of claim 1 wherein said plate further comprises an aligning feature slidably engageable with said mandrel and operable to align said plate in directions normal to said longitudinal axis of said mandrel.
7 . The apparatus of claim 6 wherein said centering feature comprises plural pins affixed to said first surface of said plate and arranged for slidable engagement with an interior surface of said tubular mandrel when said end of said mandrel is bearably engaged with said plate.
8 . A method of creating an earthen shaft for a concrete pile comprising the steps of:
(a) driving a plate into earth with an elongate tubular mandrel, said plate tethered to said mandrel by a tether having a first end connected to said mandrel proximate a longitudinal centerline of said mandrel and a second end connected proximate a periphery of a surface of said plate; and (b) withdrawing said mandrel and said plate from the resulting shaft.
9 - 10 . (canceled)
11 . A method for creating a concrete pile in the earth comprising the steps of:
(a) placing a plate on an earthen surface; (b) engaging a first surface of said plate with an end of an elongate tubular mandrel, said plate attached to said mandrel by a tether affixed proximate a longitudinal axis of said mandrel and at a periphery of said first surface of said plate; (c) driving said mandrel and said plate into the earth to create a shaft; (d) injecting a fluid grout into said tubular mandrel while driving said plate, said grout flowable into said shaft from said mandrel at a portion of a wall of said mandrel defining a grout passage proximate said end of said mandrel; and (e) withdrawing said mandrel and said plate from said shaft, grout in said mandrel flowing from said end of said mandrel as said mandrel is withdrawn.
12 . The method for creating a concrete pile of claim 11 further comprising the step of blocking said grout passage in said mandrel during withdrawal of said mandrel and said plate.
13 - 14 . (canceled)Join the waitlist — get patent alerts
Track US2014003868A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.