Ship with sinking prevention tank and method for manufacturing the same
Abstract
The present invention relates to a ship with sinking prevention tanks and a method for manufacturing the same wherein the ship includes: tank-retaining parts formed on the port and starboard sides of the bottom of a hull; the sinking prevention tanks insertedly disposed in the tank-retaining parts and having gas charging parts formed thereon so as to charge helium gas thereinto; a blocking wall adapted to block the top sides of the tank-retaining parts in which the sinking prevention tanks are insertedly disposed; gas supply lines connected to the gas charging parts formed on the sinking prevention tanks; and charging valves disposed on the inner side of the deck of the hull in such a manner as to be connected to the gas supply lines and thus to recharge the helium gas to the interiors of the sinking prevention tanks through the gas charging parts.
Claims
exact text as granted — not AI-modified1 . A ship with sinking prevention tanks comprising:
tank-retaining parts formed on the port and starboard sides of the bottom of a hull; the sinking prevention tanks insertedly disposed in the rank-retaining parts and having gas charging parts formed thereon so as to charge helium gas thereinto; a blocking wall adapted to block the too sides of the tank-retaining parts in which the sinking prevention tanks are insertedly disposed; gas supply lines connected to the gas charging parts formed on the sinking prevention tanks; and charging valves disposed on the inner side of the deck of the hull in such a manner as to be connected to the gas supply lines and thus to recharge the helium gas to the interiors of the sinking prevention tanks through the gas charging parts.
2 . The ship with sinking prevention tanks according to claim 1 , further comprising: auxiliary tank-retaining parts formed on the center of the bottom of the hull; and auxiliary sinking prevention tanks insertedly disposed in the auxiliary tank-retaining parts and having the helium gas charged thereinto, the auxiliary sinking prevention tanks being connected to the gas supply lines and the charging valves.
3 . The ship with sinking prevention tanks according to claim 2 , wherein each of the tank-retaining parts in which the sinking prevention tank is disposed has a urethane foam insertedly disposed therein so as to absorb the impacts caused by the destruction of the hull and to protect the sinking prevention tanks insertedly disposed therein.
4 . A method for manufacturing a ship with sinking prevention tanks, the method comprising the steps of:
forming tank-retaining parts on the port and starboard sides of the bottom of a hull; insertedly disposing a urethane foam in each of the tank-retaining parts; insertedly disposing the sinking prevention tanks in the tank-retaining parts each having the urethane foam insertedly disposed therein; blocking the top sides of the tank-retaining parts in which the sinking prevention tanks are insertedly disposed by means of a blocking wall; connecting the sinking prevention tanks insertedly disposed in the tank-retaining parts to gas supply lines; and connecting the gas supply lines connected to the sinking prevention tanks, to charging valves.Join the waitlist — get patent alerts
Track US2014216320A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.