US2014262517A1PendingUtilityA1
Drilling rig for drilling from underground tunnels
Est. expiryMar 14, 2033(~6.6 yrs left)· nominal 20-yr term from priority
E21B 43/30E21B 7/00E21B 19/16E21B 19/14E21B 7/024E21C 41/24E21B 19/08
30
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A rig for drilling a borehole from an underground tunnel includes a base assembly, a drilling assembly mounted to the base assembly, an upper frame assembly mounted to the drilling assembly above the base assembly, and a support hood coupled to the drilling assembly and positioned above the upper frame assembly. The support hood is configured to bear against a ceiling of the tunnel during drilling operations.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A rig for drilling a borehole from an underground tunnel, the rig comprising:
a base assembly; a drilling assembly mounted to the base assembly; an upper frame assembly mounted to the drilling assembly above the base assembly; a support hood coupled to the drilling assembly and positioned above the upper frame assembly, wherein the support hood is configured to bear against a ceiling of the tunnel during drilling operations.
2 . The rig of claim 1 , wherein the base assembly comprises:
a trolley configured to roll along a track; a drilling floor including a drilling hole configured to pass a drill string; and a plurality of positioning assemblies mounted to the trolley, wherein each positioning assembly includes a foot configured to extend downward into engagement with a floor of the underground tunnel.
3 . The rig of claim 2 , wherein the drilling assembly is pivotally coupled to the base.
4 . The rig of claim 2 , wherein the base assembly further comprises a clamping system disposed below the drilling rig floor and configured to deliver rotational torque to a pipe joint disposed in the drilling hole.
5 . The rig of claim 1 , wherein the drilling assembly comprises:
a drilling carriage including a top drive; and an actuator mounted to the drilling carriage, the support hood, and the base assembly; wherein the actuator is configured to move the drilling carriage downward to apply weight-on-bit.
6 . The rig of claim 1 , wherein the upper frame assembly comprises:
a frame member coupled to the drilling assembly; and a track assembly coupled to both the frame member and a tunnel track extending along the underground tunnel; a pipe carriage moveably coupled to the track assembly, wherein the pipe carriage supports a plurality of pipe joints.
7 . The rig of claim 6 , wherein the track assembly is coupled to the tunnel track with a switch, and wherein the switch is configured to selectively allow the pipe carriage to enter the track assembly from the tunnel track.
8 . The rig of claim 7 , wherein the upper frame assembly further comprises a toothed gear rotatably coupled to the upper frame assembly and configured to engage teeth disposed on the pipe carriage.
9 . The rig of claim 1 , further comprising a pipe handling assembly coupled to the drilling rig assembly, wherein the pipe handling assembly includes a pipe manipulator configured to engage and rotate a pipe joint.
10 . The rig of claim 9 , wherein the pipe manipulator comprises:
a housing; a finger pivotally coupled to the housing; a first roller disposed on the finger; a second roller disposed on the housing; and a third roller disposed on the finger, adjacent the first roller; wherein one of the first, second, and third rollers is configured to be rotated by an actuator.
11 . A rig for drilling a borehole from an underground tunnel, the rig comprising:
a base assembly; a drilling assembly mounted to the base assembly; an upper frame assembly a pipe handling assembly mounted to the drilling assembly; a track assembly positioned above the pipe handling assembly, wherein the track assembly is configured to deliver pipe joints to the pipe handling assembly during drilling operations.
12 . The rig of claim 11 , further comprising a support hood coupled to the drilling assembly, wherein the support hood is configured to bear against a ceiling of the tunnel during drilling operations.
13 . The rig of claim 11 , wherein the base assembly comprises a base; and
wherein the drilling assembly is pivotally coupled to the base.
14 . The rig of claim 12 , wherein the drilling assembly comprises:
a drilling carriage; a top drive coupled to the drilling carriage; and an actuator extending vertically between the support hood and the base assembly; wherein the actuator is coupled to the drilling carriage and configured to move the drilling carriage up and down.
15 . The rig of claim 11 , wherein the pipe handling assembly comprises:
a pipe manipulator configured to engage a pipe joint during drilling operations, the pipe manipulator further comprising: a housing; a finger pivotally coupled to the housing; a first roller disposed on the finger; a second roller disposed on the housing; and a third roller disposed on the finger, adjacent the first roller; wherein one of the first, second, and third rollers is configured to be rotated by an actuator.
16 . The rig of claim 15 , wherein the track assembly is coupled to a tunnel track extending along the underground tunnel; and
wherein the tunnel track and track assembly are each configured to guide a pipe carriage holding a plurality of pipe joints.
17 . The rig of claim 16 , wherein the upper frame assembly further comprises a pipe carriage positioning mechanism disposed adjacent the track assembly and configured to position a pipe carriage relative to the pipe handling assembly.
18 . A method of drilling a borehole from an underground tunnel, the method comprising:
(a) supplying a plurality of pipe joints to a drilling rig; (b) gripping a first pipe joint with a pipe handling assembly; (c) coupling the first pipe joint to a drill string with the pipe handling assembly; (d) applying a vertical load to the drill string; and (e) bearing against a ceiling of the tunnel during (d).
19 . The method of claim 18 , wherein (a) comprises:
carrying the plurality of pipe joints with a pipe carriage; guiding the pipe carriage along a track assembly to the drilling rig; and aligning the pipe joint with the pipe handling assembly.
20 . The method of 19 , wherein aligning the pipe joint with a pipe handling assembly comprises engaging teeth disposed on the pipe carriage with a sprocket rotatably mounted to the drilling rig.
21 . The method of claim 18 , wherein (b) further comprises extending a pipe manipulator to engage a pipe joint, the pipe manipulator comprising:
a housing; a finger pivotally coupled to the housing; a first roller disposed on the finger; a second roller disposed on the housing; a third roller disposed on the finger, adjacent the first roller wherein one of the first, second, am third rollers is configured to be rotated by an actuator.
22 . The method of claim 21 , wherein (b) comprises engaging the pipe joint between the first, second, and third rollers.
23 . The method of claim 22 , further comprising rotating the pipe joint during (c) with the first, second, or third roller.
24 . The method of claim 18 , wherein (d) comprises extending a linear actuator to force a drilling carriage downward.
25 . The method of claim 18 , further comprising:
(e) supporting the drilling assembly on a base assembly; (f) rotating the drilling assembly about the base assembly; (g) engaging rollers disposed on the base assembly with a track disposed within the underground tunnel.
26 . The method of claim 25 , further comprising engaging a floor of the underground tunnel with a foot disposed on the base assembly.Join the waitlist — get patent alerts
Track US2014262517A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.