Steam Turbine Equipment
Abstract
Steam turbine equipment is provided that can sharply adjust power generation output based on a variation in power demand while improving power generation efficiency during operation at a rated power generation output. The steam turbine equipment includes a steam control valve 4 disposed in a main steam pipe 2 leading from a boiler 1 to a steam turbine, an overload valve 6 disposed in an overload steam pipe 5 that bypasses the steam control valve 4 and leads from the main steam pipe 2 to a lower-pressure side of a steam turbine than a point where the main steam pipe 2 connects to the steam turbine, and a slit portion 31 through which the steam having flowed through the overload steam pipe 5 passes before flowing into a steam turbine stage portion. The slit portion 31 is configured such that its width C in an axial direction of a turbine rotor 15 is smaller than an inside diameter d of the overload steam pipe 5 (d>C).
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . Steam turbine equipment, comprising:
a main steam pipe for leading steam generated in a steam generating source to a steam turbine; a main steam control valve disposed in the main steam pipe; an overload steam pipe that branches from the main steam pipe and bypasses the steam control valve such that the steam generated in the steam generating source is led to a lower-pressure side of the steam turbine than a point where the main steam pipe connects to the steam turbine; an overload valve disposed in the overload steam pipe; and a slit portion through which the steam that has passed through the overload valve passes before flowing into a steam turbine stage portion, wherein the slit portion is configured such that its width in an axial direction of a turbine rotor 15 is smaller than an inside diameter of the overload steam pipe.
2 . The steam turbine equipment according to claim 1 ,
wherein the slip portion is formed between a diaphragm outer ring and a casing.
3 . The steam turbine equipment according to claim 1 ,
wherein the slit portion is formed between two casings.
4 . The steam turbine equipment according to claim 1 ,
wherein the slit portion is formed between diaphragm outer rings of two adjacent stages in an axial direction of the turbine.
5 . The steam turbine equipment according to claim 1 ,
wherein the overload steam pipe is fitted to a casing.
6 . The steam turbine equipment according to claim 1 ,
wherein the overload steam pipe is welded to a casing.Join the waitlist — get patent alerts
Track US2015125266A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.