Uniform texture for cast in place walls
Abstract
A method of forming a concrete wall having a substantially uniform exterior surface texture. The method includes the initial step of pouring concrete into a wall form. The concrete is poured from a first mixture and is allowed to cure. After the concrete is cured, the wall form is removed from the resultant concrete base structure. A roughened texture is then created on the base structure. A finishing mixture is then applied to the roughened texture. The finishing mixture may be created by separating the aggregate from a portion of the remaining first mixture. The finishing mixture creates a smooth texture on the exterior surfaces of the initially formed base structure.
Claims
exact text as granted — not AI-modified1 .- 20 . (canceled)
21 . A method of forming a concrete structure comprising the steps of:
disposing a first concrete mixture into a form, wherein the first concrete mixture includes large aggregate; allowing the first concrete mixture to at least partially harden and form a concrete base structure; providing a finishing concrete mixture including aggregate; and applying the finishing mixture to an exterior surface of the base structure.
22 . The method of claim 21 , further comprising the step of creating a roughened exterior surface.
23 . The method of claim 21 , further comprising the step of removing the form.
24 . The method of claim 21 , further comprising the step of troweling the finishing mixture once applied to the base structure.
25 . The method of claim 21 , further comprising the step of separating large aggregate from a portion of the finishing concrete mixture.
26 . A method of forming a concrete structure having a substantially uniform exterior surface texture, comprising the steps of:
allowing a first mixture of concrete including large aggregate to at least partially harden and form a concrete base structure; creating a finishing mixture having a lesser amount of large aggregate than the first mixture of concrete; and applying the finishing mixture to the base structure.
27 . The method of claim 26 further comprising the step of disposing the first mixture of concrete into a form.
28 . The method of claim 26 further comprising the step of creating a roughened exterior surface on the base structure.
29 . The method of claim 26 , wherein the step of creating finishing mixture includes separating the large aggregate from a portion of the first concrete mixture.Join the waitlist — get patent alerts
Track US2015308108A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.