Method and apparatus for zonal isolation of subterranean formations using set-on-demand slurries
Abstract
Methods are disclosed for providing zonal isolation of subterranian formations. One embodiment may include mixing a dry blended material with water at a central location to create a suspension, transferring the suspension to one or more storage tanks at the central location, transferring the suspension to one or more storage tanks at a rig site, recirculating the suspension in the one or more storage tanks at the rig site, and pumping the suspension into a well. Another embodiment may include mixing a dry blended material with water in one or more storage tanks at a rig site to create a suspension, recirculating the suspension in the one or more storage tanks at the rig site, and pumping the suspension into a well.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method of providing zonal isolation of subterranean formations, comprising:
mixing a dry blended material with a liquid at a central location to create a suspension; transferring the suspension to one or more storage tanks at the central location; recirculating the suspension in the one or more storage tanks at the central location; transferring the suspension to one or more storage tanks at a rig site; recirculating the suspension in the one or more storage tanks at the rig site; and pumping the suspension into a well.
2 . The method of claim 1 , further comprising adding an accelerator to the suspension at the time of pumping.
3 . The method of claim 2 , further comprising adding at least one additive to the suspension at a designated time prior to pumping.
4 . The method of claim 2 , further comprising foaming the suspension after adding the accelerator.
5 . The method of claim 1 , further comprising testing the suspension at the central location.
6 . The method of claim 5 , further comprising adjusting the properties of the suspension in response to the testing at the central location.
7 . The method of claim 1 , further comprising testing the suspension at the rig site.
8 . The method of claim 7 , further comprising adjusting the properties of the suspension in response to the testing at the rig site.
9 . The method of claim 1 , wherein the one or more storage tanks comprise at least one of a suspension storage tank, an accelerant storage tank, and an additive storage tank.
10 . The method of claim 1 , further comprising storing the suspension in the one or more storage tanks at the central location.
11 . The method of claim 1 , further comprising storing the suspension in the one or more storage tanks at the rig site.
12 . A method of providing zonal isolation of subterranean formations, comprising:
mixing a dry blended material with a liquid in one or more storage tanks at a rig site to create a suspension; recirculating the suspension in the one or more storage tanks at the rig site; and pumping the suspension into a well.
13 . The method of claim 12 , further comprising adding an accelerator to the suspension at a designated time prior to pumping.
14 . The method of claim 12 , further comprising adding at least one additive to the suspension at a designated time prior to pumping.
15 . The method of claim 13 , further comprising foaming the suspension after adding the accelerator.
16 . The method of claim 12 , further comprising testing the suspension at the rig site.
17 . The method of claim 16 , further comprising adjusting the properties of the suspension in response to the testing at the rig site.
18 . The method of claim 12 , wherein the one or more storage tanks comprise at least one of a suspension storage tank, an accelerant storage tank, and an additive storage tank.
19 . The method of claim 12 , wherein the dry blended material is mixed in the one or more storage tanks at a rig site to create a suspension.
20 . A method of providing zonal isolation of subterranean formations, comprising:
mixing a dry blended material with a liquid in one or more storage tanks at a rig site to create a suspension; recirculating the suspension in the one or more storage tanks at the rig site; storing the suspension in the one or more storage tanks at the rig site adding at least one additive to the suspension at a designated time prior to pumping; and pumping the suspension into a well.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.