US2017167207A1PendingUtilityA1

Tool carrier for a well rig

51
Assignee: PROSTAR MFG INCPriority: Dec 11, 2015Filed: Dec 9, 2016Published: Jun 15, 2017
Est. expiryDec 11, 2035(~9.4 yrs left)· nominal 20-yr term from priority
E21B 15/00E21B 7/02E21B 19/07E21B 7/023E21B 19/16
51
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A tool carrier, which is also known as a top drive or a power swivel, for a well operation rig includes link arms coupled between the rotating hook assembly and the lower pipe gripping structure, the link arms each secured to the rotating hook assembly by a first rigid connection and secured to the lower pipe gripping structure by a second rigid connection such that the link arms can extend along well center even when operating in slant. Another tool carrier includes a hinge between the mast and the main housing. The hinge permits the tool carrier to be moved into a more central position when folded onto the rig chassis for transport.

Claims

exact text as granted — not AI-modified
1 . A tool carrier for a well operation rig, comprising:
 tool support structures; and   a bracket to connect the tool support structures into a mast of the well operation rig, the bracket including: a first portion mountable onto the mast; a second portion connected to the tool support structures; and a hinge configured to permit the second portion to pivot away from the first portion, while the first portion remains connected to the second portion.   
     
     
         2 . The tool carrier of  claim 1  wherein the tool support structures include a rotating hook assembly and pipe gripping structures. 
     
     
         3 . The tool carrier of  claim 1  wherein the first portion is a mounted leaf including drive assembly connectors and the second portion is a swing leaf. 
     
     
         4 . The tool carrier of  claim 1  wherein the tool support structures include a long axis and the hinge includes a hinge pin oriented along a height of the bracket and defining a pivot axis substantially parallel to the long axis. 
     
     
         5 . The tool carrier of  claim 1  wherein the hinge includes a releasable lock to hold the hinge against pivoting around the hinge pin and the releasable lock being releasable to permit the first portion to pivot relative to the second portion. 
     
     
         6 . The tool carrier of  claim 1 , further comprising a linear actuator for driving the second portion relative to the first portion. 
     
     
         7 . A truck-conveyed well operation rig comprising:
 a truck with a chassis, the chassis having a front, a back, a left side and a right side;   a rig mast folded in a transport position on the chassis, the rig mast including an upper mast section supported on and extending along a length of the chassis and a lower mast section extending alongside the upper mast section; and   a tool carrier connected to the rig mast and carried in a substantially central position between the left side and the right side.   
     
     
         8 . The truck-conveyed well operation rig of  claim 7 , further comprising a hinge frame between the tool carrier and the rig mast, the hinge configured to pivot the tool carrier to assume the substantially central position. 
     
     
         9 . A method for storing a well operation rig for transport, the method comprising:
 folding an upper mast section about a pivotal connection down against a lower mast section;   pivoting a tool carrier on a hinge connected between the tool carrier and the lower mast section to move the tool carrier away from the lower mast section toward the upper mast section; and   lowering the lower mast section and the upper mast section onto a chassis of the well operation rig, wherein the tool carrier is positioned above the lower mast section and the upper mast in a substantially central position between a left side and a right side of the chassis.   
     
     
         10 . The method of  claim 9  wherein pivoting the tool carrier includes unlocking a releasable lock on the hinge and driving the tool carrier to pivot on the hinge. 
     
     
         11 . A tool carrier for a well operation rig, comprising:
 a main housing;   a mounting bracket configured to mount the main housing to a rig mast;   a drive system for imparting rotational drive through a quill;   a rotating hook assembly;   a lower pipe gripping structure; and   link arms coupled between the rotating hook assembly and the lower pipe gripping structure, the link arms each secured to the rotating hook assembly by a first rigid connection and secured to the lower pipe gripping structure by a second rigid connection.   
     
     
         12 . The tool carrier of  claim 11  wherein the first rigid connection includes a bolt and plate clamp assembly securing an upper end of the link arm to a hook on the rotating hook assembly. 
     
     
         13 . The tool carrier of  claim 11 , further comprising a rigid strut connected between each link arm and the rotating hook assembly. 
     
     
         14 . The tool carrier of  claim 11  wherein the second rigid connection is a multipoint connection. 
     
     
         15 . The tool carrier of  claim 11  wherein the lower pipe gripping structure is travelling slips. 
     
     
         16 . The tool carrier of  claim 11  wherein the drive system includes a cushion sub within a slew bearing and a centralizer ring encircling the cushion sub and positioned in a space between the cushion sub and the slew bearing. 
     
     
         17 . The tool carrier of  claim 11 , further comprising a pipe gripping wrench coupled to the rotating hook assembly and positioned between the lower pipe gripping structure and the quill.

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.