US2018018107A1PendingUtilityA1

Updating storage migration rates

57
Assignee: IBMPriority: Jun 24, 2016Filed: Oct 9, 2017Published: Jan 18, 2018
Est. expiryJun 24, 2036(~9.9 yrs left)· nominal 20-yr term from priority
G06F 3/0647G06F 3/067G06F 3/061G06F 3/065G06F 3/0619G06F 3/0613
57
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A computer-implemented method includes identifying a storage migration. The storage migration is associated with a storage area network. The storage migration has a storage migration rate associated therewith. The method includes identifying an input/output throughput. The input/output throughput is associated with the storage area network. The input/output throughput stores a throughput rate for the storage area network. The method includes identifying a service level agreement rate for the input/output throughput. The method includes identifying a non-essential workload. The non-essential workload stores a non-essential workload rate associated therewith. The non-essential workload includes that portion of said input/output throughput that is for one or more background processes. The method includes determining an analyzed rate based on the throughput rate, the service level agreement rate, and the non-essential workload rate. The method includes updating the storage migration rate based on the analyzed rate.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A computer-implemented method comprising:
 identifying a storage migration, said storage migration being associated with a storage area network, said storage migration having a storage migration rate associated therewith;   identifying an input/output throughput, said input/output throughput being associated with said storage area network, said input/output throughput storing a throughput rate for said storage area network;   identifying a service level agreement rate for said input/output throughput;   identifying a non-essential workload, said non-essential workload storing a non-essential workload rate associated therewith, said non-essential workload comprising that portion of said input/output throughput that is for one or more background processes;   determining an analyzed rate based on said throughput rate, said service level agreement rate, and said non-essential workload rate; wherein determining said analyzed rate comprises:
 analyzing said throughput rate, analyzing said service level agreement rate, and analyzing said non-essential workload rate to yield an analyzed rate is based on predictive analytics, the predictive analytics predicting how removing said non-essential workload from said input/output throughput will impact said storage migration rate; 
 wherein said predictive analytics is based on a normal autoregressive integrated moving average model; and 
 generating an analytics profile, the analytics profile storing variables associated with previous rates; and 
   updating said storage migration rate based on said analyzed rate and said analytics profile,
 wherein updating said storage migration based on said analyzed rate includes updating a priority level associated with said storage migration, and 
 wherein updating said storage migration based on said analyzed rate includes reducing said non-essential workload rate.

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.