US2018195390A1PendingUtilityA1
Mining underground formations
Est. expiryJan 9, 2037(~10.5 yrs left)· nominal 20-yr term from priority
E21C 27/24E21D 23/0086E21D 23/0472E21D 23/10E21D 23/081
38
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
Mining systems include a continuous miner; a movable roof support; a roof bolter; and a flexible conveyor train positioned with its front end located under the roof support and extending underneath the roof bolter.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A mining system comprises:
a continuous miner; a movable roof support; a roof bolter; and a flexible conveyor train positioned with its front end located under the roof support and extending underneath the roof bolter.
2 . The system of claim 1 , wherein the roof support comprises:
two tracks; legs mounted on the two tracks; and a canopy supported by legs and the two tracks; wherein the legs and the tracks are spaced apart to define a gap that is wide enough to receive the flexible conveyor train through the gap.
3 . The system of claim 2 , wherein the gap is at least 14 feet (4.3 meters).
4 . The system of claim 2 , wherein the legs comprise hydraulic pistons.
5 . The system of claim 2 , wherein the moveable roof support is a first roof support and the mining system comprises a second moveable roof support.
6 . The system of claim 5 , comprising chains extending between a canopy of the first moveable roof support and a canopy of the second moveable roof support
7 . The system of claim 2 , wherein the moveable roof support comprises a canopy and an extendable portion movable between an extended position and a retracted position by a piston.
8 . The system of claim 1 , wherein the roof bolter comprises:
two tracks; a canopy supported by the two tracks; wherein the tracks are spaced apart to define a gap that is wide enough to receive the flexible conveyor train through the gap.
9 . The system of claim 8 , wherein the gap is at least 14 feet (4.3 meters).
10 . The system of claim 8 , wherein the roof bolter comprises six drill masts.
11 . The system of claim 8 , wherein the canopy is supported by legs mounted on the two tracks.
12 . The system of claim 11 , wherein the legs comprise hydraulic pistons.
13 . The system of claim 8 , wherein the canopy is supported by a scissors lift system mounted on the two tracks.
14 . The system of claim 8 , wherein the canopy comprises a work platform.
15 . The system of claim 14 , wherein the roof support comprises four drill masts pivotably mounted to the working platform and oriented upwards to install roof bolts.
16 . The system of claim 15 , wherein the roof support comprises two drill masts that are pivotably mounted to the working platform and oriented sideways to install rib bolts.
17 . A method of mining comprising:
positioning a first movable roof support between a continuous miner and a roof bolter; and extending a flexible conveyor train between tracks of the roof bolter and between tracks of the first movable roof support and positioning a hopper of the flexible conveyor train to receive output of the continuous miner.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.