US2019195531A1PendingUtilityA1
Superheated steam generator and maintenance method therefor
Est. expiryDec 21, 2037(~11.4 yrs left)· nominal 20-yr term from priority
F22G 5/00F24H 2250/08F24H 3/0405F24H 9/1863F22G 1/165F24H 9/2071F24H 15/37F24H 15/25F24H 15/395F24H 15/208F24H 15/104F24H 15/269
43
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
The present invention is intended to inform a user of a maintenance timing for a superheated steam generator. The present invention includes an induction heating type or electrically heating type superheated steam generation section and an informing section. The superheated steam generation section generates superheated steam by heating steam. The informing section transmits maintenance information by employing, as a parameter, an operating temperature of the superheated steam generation section and an operating time at the operating temperature.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A superheated steam generator, comprising:
an induction heating type or electrically heating type superheated steam generation section configured to generate superheated steam by heating steam; and an informing section configured to transmit maintenance information by employing, as a parameter, an operating temperature of the superheated steam generation section and an operating time at the operating temperature.
2 . The superheated steam generator according to claim 1 , wherein
the informing section acquires operating temperature data indicating the operating temperature of the superheated steam generation section, and operating time data indicating the operating time at the operating temperature, the informing section converts the operating time to an operating time at a predetermined temperature and integrates converted values, and the informing section transmits the maintenance information when an integration value exceeds a predetermined integration threshold value.
3 . The superheated steam generator according to claim 2 , wherein the informing section corrects the integration value on a basis of an amount of superheated steam generation in the superheated steam generation section, and the informing section transmits the maintenance information when a corrected integration value exceeds the integration threshold value.
4 . The superheated steam generator according to claim 2 , wherein the informing section is configured to convert to an operating time at 1200° C. and integrate the converted values.
5 . The superheated steam generator according to claim 1 , wherein
the superheated steam generation section comprises a conductor tube that permits passage of the superheated steam, and the informing section is configured to transmit the maintenance information indicating a replacement timing for the conductor tube.
6 . The superheated steam generator according to claim 5 , wherein the informing section is configured to transmit the maintenance information by employing, as a parameter, an operating time at an operating temperature at which a volume reduction rate of the conductor tube reaches or exceeds a predetermined value by operating for a predetermined period of time.
7 . The superheated steam generator according to claim 1 , wherein the informing section specifies a temperature range used for the maintenance information at the operating temperatures of the superheated steam generation section, and utilizes the operating time at the operating temperatures included in the temperature range, as the operating time at a highest temperature in the temperature range.
8 . The superheated steam generator according to claim 1 , wherein the superheated steam generation section comprises:
a first superheated steam generation section of the induction heating type configured to carry out induction heating by using, as a secondary coil, a first conductor tube that permits passage of steam, and a second superheated steam generation section of the electrically heating type configured to further heat superheated steam generated in the first superheated steam generation section by electrically heating a second conductor tube that permits passage of the superheated steam.
9 . The superheated steam generator according to claim 8 , wherein the informing section is configured to transmit the maintenance information indicating a replacement timing for the second conductor tube.
10 . The superheated steam generator according to claim 8 , wherein
the first superheated stem generation section generates superheated steam at less than 1000° C., and the second superheated stem generation section generates superheated steam at 1000° C. or above.
11 . A maintenance method for a superheated steam generator of an induction heating type or an electrically heating type configured to generate superheated steam by heating steam, the maintenance method comprising:
transmitting maintenance information by employing, as a parameter, an operating temperature of the superheated steam generation section and an operating time at the operating temperature.Join the waitlist — get patent alerts
Track US2019195531A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.