US2020161860A1PendingUtilityA1

Proactive intelligent load shedding

61
Assignee: OPERATION TECH INCPriority: Jun 29, 2012Filed: Sep 27, 2019Published: May 21, 2020
Est. expiryJun 29, 2032(~6 yrs left)· nominal 20-yr term from priority
Y02B70/3225Y04S20/222Y10T307/25H02J 13/00009H02J 3/14H02J 2103/30H02J 13/1313H02J 13/14H02J 2105/12
61
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A power control system utilizing real-time power system operating data to effectuate predictive load shedding so as to accurately predict the need for and the optimal type of responsive action to a contingency—before the contingency actually occurs.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A power control system comprising:
 a power system having one or more subsystems and electrically connected to one or more loads; and   a load shedding system operable to receive data regarding the power system and to selectively disconnect one or more loads and/or subsystems from the power system, the load shedding system comprising a controller operable to:
 receive data regarding the power system, loads and electrical connections therebetween, 
 identify whether a contingency has occurred, and if so, it's type and location, 
 calculate an optimal response to the contingency based on the received data, and 
 selectively disconnecting one or more loads and/or subsystems according to the optimal response such that no disconnection occurs where the controller identifies the contingency as occurring in subsystem that is already disconnected from the power system.

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.