Methods and tools for determining bleed-off pressure after well securement jobs
Abstract
A system for setting a wellhead pressure after a through tubing bridge plug is installed in a wellbore includes a slickline unit, a static bottomhole pressure gauge, and a pressure setting unit. The slickline unit includes the static bottomhole pressure gauge. The static bottomhole pressure gauge includes internal memory that stores a measured bottomhole pressure. The pressure setting unit sets a wellhead pressure based on the measured bottomhole pressure stored in the internal memory of the static bottomhole pressure gauge. A related method includes installing a through tubing bridge plug in a wellbore, deploying a slickline unit into the wellbore, wherein the slickline unit includes a pressure gauge, measuring bottomhole pressure with the pressure gauge, and setting a wellhead pressure based on the measured bottomhole pressure.
Claims
exact text as granted — not AI-modifiedWhat is claimed:
1 . A method comprising:
installing a through tubing bridge plug in a wellbore; deploying a slickline unit into the wellbore, wherein the slickline unit includes a pressure gauge; measuring bottomhole pressure with the pressure gauge; and setting a wellhead pressure based on the measured bottomhole pressure.
2 . The method according to claim 1 , wherein the slickline unit is deployed to position the pressure gauge at a predetermined distance above the through tubing bridge plug.
3 . The method according to claim 1 , wherein setting the wellhead pressure comprises determining wellhead pressure available for bleed-off.
4 . The method according to claim 3 , wherein:
the plug has an associated differential pressure limit; and determining the wellhead pressure available for bleed-off is based on the measured bottomhole pressure and a differential pressure limit of the plug.
5 . The method according to claim 4 , wherein determining the wellhead pressure available for bleed-off is based on the measured bottomhole pressure, the differential pressure limit of the plug and a safety factor.
6 . The method according to claim 1 , further comprising:
capping the through tubing bridge plug with cement; and the slickline unit is deployed at a predetermined time after setting of the cement.
7 . The method according to claim 1 , further comprising storing, at a first data storage location, data that includes the measured bottomhole pressure.
8 . The method according to claim 7 , further comprising:
transferring the stored data from the first data storage location to a second data storage location; and obtaining the data from the second data storage location to use in setting the wellhead pressure.
9 . The method according to claim 8 , further comprising retrieving the pressure gauge out of the wellbore after said measuring.
10 . The method according to claim 9 , wherein the first data storage location comprises internal memory disposed in the pressure gauge.
11 . The method according to claim 10 , wherein the transferring of data comprises transferring data from the internal memory of the pressure gauge to the second data storage location.
12 . The method according to claim 1 , wherein:
the slickline unit includes a terminal component disposed at a free end of the slickline unit; and the pressure gauge is disposed axially adjacent to the terminal component.
13 . The method according to claim 12 , wherein the terminal component is a gauge cutter.
14 . The method according to claim 12 , wherein the terminal component is a lead impression block.
15 . The method according to claim 1 , wherein the pressure gauge is a static bottomhole pressure gauge.
16 . A system for setting a wellhead pressure after a through tubing bridge plug is installed in a wellbore, said system comprising:
a slickline unit that includes a static bottomhole pressure gauge; the static bottomhole pressure gauge including internal memory that stores a measured bottomhole pressure; and a pressure setting unit that sets a wellhead pressure based on the measured bottomhole pressure stored in the internal memory of the static bottomhole pressure gauge.
17 . The system according to claim 16 , wherein:
the slickline unit includes a terminal component disposed at a free end of the slickline unit; and the pressure gauge is disposed axially adjacent to the terminal component.
18 . The system according to claim 17 , wherein the terminal component is a gauge cutter.
19 . The system according to claim 18 , wherein the terminal component is a lead impression block.
20 . A method comprising:
installing a through tubing bridge plug in a wellbore; capping the through tubing bridge plug with cement; deploying a slickline unit into the wellbore, wherein the slickline unit includes a pressure gauge; measuring bottomhole pressure with the pressure gauge; storing, at a first data storage location, data that includes the measured bottomhole pressure; transferring the stored data from the first data storage location to a second data storage location; obtaining the data from the second data storage location to use in setting a wellhead pressure; and setting a wellhead pressure based on the measured bottomhole pressure.Join the waitlist — get patent alerts
Track US2023110038A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.