US2023202753A1PendingUtilityA1

Waste transfer facility

Assignee: POLOWNIAK SHAWNPriority: Sep 15, 2021Filed: Feb 17, 2023Published: Jun 29, 2023
Est. expirySep 15, 2041(~15.1 yrs left)· nominal 20-yr term from priority
B09B 5/00B03B 9/06B65F 9/00
60
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

This disclosure relates to a waste transfer facility. The waste transfer facility includes a first level, the first level positioned at a first height, the first level including a first side, and a second side. The waste transfer facility also includes a second level, the second level positioned at a second height different than the first height, the second level including a plurality of waste receptacles, the plurality of waste receptacles including a first waste receptacle positioned adjacent to the first side to receive waste, a second waste receptacle positioned adjacent to the second side to receive waste, and a non-compliant waste receptacle to receive non-compliant waste, the non-compliant waste to be removed from the waste.

Claims

exact text as granted — not AI-modified
What is claimed is: 
     
         1 . A facility comprising:
 a first level, the first level positioned at a first height, the first level including a first side, and a second side; and   a second level, the second level positioned at a second height different than the first height, the second level including a plurality of waste receptacles, the plurality of waste receptacles including a first waste receptacle positioned adjacent to the first side to receive waste, a second waste receptacle positioned adjacent to the second side to receive waste, and a non-compliant waste receptacle to receive non-compliant waste, the non-compliant waste to be removed from the waste.

Join the waitlist — get patent alerts

Track US2023202753A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.