Train control system and train control method
Abstract
A train control system includes: a plurality of trains; a train operation control device that identifies a relief-object train that is a train having failure and determines a relief train that is a train that moves on to the relief-object train to relieve the relief-object train and a protective section in which the relief train can travel, on the basis of on-track information acquired from the trains; and a ground control device that sets, in the trains, the protective section determined by the train operation control device. The trains each transmit the on-track information including location information and failure information with use of which the train operation control device can determine a state of a failure when the failure occurs, to the train operation control device via the ground control device.
Claims
exact text as granted — not AI-modified1 . A train control system comprising:
a plurality of trains; a train operation control device to identify a relief-object train that is a train having failure, determine a relief train that is a train that moves on to the relief-object train to relieve the relief-object train, and determine a section from the relief train to a rear side of the relief-object train in which the relief train can travel, to be a protective section, on the basis of on-track information acquired from the trains; and a ground control device to set, in the trains, the protective section determined by the train operation control device, wherein the trains each transmit the on-track information including location information and failure information with use of which the train operation control device can determine a state of a failure when the failure occurs, to the train operation control device via the ground control device.
2 . The train control system according to claim 1 , wherein
in a case where the relief-object train can be restored and the relief train capable of traveling to a rear side of the relief-object train from behind on the same track on which the relief-object train has been stopped is found, the train operation control device determines a section from the relief train to the rear side of the relief-object train to be a protective section that can be released after the relief train has traveled therein, and the ground control device releases a subsection traveled by the relief train, of the protective section set in the train, from the protective section.
3 . The train control system according to claim 1 , wherein in a case where the relief-object train cannot be restored,
when the relief train capable of traveling to a front side of the relief-object train from a forward station on the same track on which the relief-object train has been stopped is found, the train operation control device determines a section from the forward station to the front side of the relief-object train to be the protective section, and when the relief train capable of traveling to a rear side of the relief-object train from a rearward station on the track is found, the train operation control device determines a section from the rearward station to the rear side of the relief-object train to be the protective section.
4 . The train control system according to claim 1 , wherein
in a case where the relief train is not found on the same first track on which the relief-object train has been stopped and the relief train capable of traveling to a station forward from the relief-object train from a station rearward from the relief-object train is found on a second track in a travel direction opposite to a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the rearward station to the forward station on the second station to be the protective section that can be released after the relief train has traveled therein, and the ground control device releases a subsection traveled by the relief train, of the protective section set in the train, from the protective section.
5 . The train control system according to claim 1 , wherein
in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a station forward from the relief-object train is found on a second track in a travel direction opposite to a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the second track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a station rearward from the relief-object train is found on the second track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the second track to be the protective section.
6 . The train control system according to claim 1 , wherein
in a case where the relief train is not found on the same first track on which the relief-object train has been stopped and the relief train capable of traveling to a station forward from the relief-object train from a rearward station is found on a third track in a travel direction same as a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the third track to be a protective section that can be released after the relief train has traveled therein, and the ground control device releases a subsection traveled by the relief train, of the protective section set in the train, from the protective section.
7 . The train control system according to claim 1 , wherein
in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a forward station is found on a third track in a travel direction same as a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the third track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a rearward station is found on the third track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the third track to be the protective section.
8 . A train control method in a train control system including a train operation control device, a ground control device, and trains, comprising:
a first step of the train transmitting on-track information including location information and failure information with use of which the train operation control device can determine a state of a failure when the failure occurs, to the train operation control device via the ground control device; a second step of the train operation control device identifying a relief-object train that is a train having failure, determining a relief train that is a train that moves on to the relief-object train to relieve the relief-object train, and determining a section from the relief train to a rear side of the relief-object train in which the relief train can travel, to be a protective section, on the basis of the on-track information acquired from the trains; and a third step of the ground control device setting, in the trains, the protective section determined by the train operation control device.
9 . The train control method according to claim 8 , wherein
in the second step, in a case where the relief-object train can be restored and the relief train capable of traveling to a rear side of the relief-object train from behind on the same track on which the relief-object train has been stopped is found, the train operation control device determines a section from the relief train to the rear side of the relief-object train to be a protective section that can be released after the relief train has traveled therein, and in the third step, the ground control device releases a subsection traveled by the relief train, of the protective section set in the train, from the protective section.
10 . The train control method according to claim 8 , wherein in the second step, in a case where the relief-object train cannot be restored,
when the relief train capable of traveling to a front side of the relief-object train from a forward station on the same track on which the relief-object train has been stopped is found, the train operation control device determines a section from the forward station to the front side of the relief-object train to be the protective section, and when the relief train capable of traveling to a rear side of the relief-object train from a rearward station on the track is found, the train operation control device determines a section from the rearward station to the rear side of the relief-object train to be the protective section.
11 . The train control method according to claim 8 , wherein
in the second step, in a case where the relief train is not found on the same first track on which the relief-object train has been stopped and the relief train capable of traveling to a station forward from the relief-object train from a station rearward from the relief-object train is found on a second track in a travel direction opposite to a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the rearward station to the forward station on the second station to be the protective section that can be released after the relief train has traveled therein, and in the third step, the ground control device releases a subsection traveled by the relief train, of the protective section set in the train, from the protective section.
12 . The train control method according to claim 8 , wherein
in the second step, in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a station forward from the relief-object train is found on a second track in a travel direction opposite to a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the second track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a station rearward from the relief-object train is found on the second track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the second track to be the protective section.
13 . The train control method according to claim 8 , wherein
in the second step, in a case where the relief train is not found on the same first track on which the relief-object train has been stopped and the relief train capable of traveling to a station forward from the relief-object train from a rearward station is found on a third track in a travel direction same as a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the third track to be a protective section that can be released after the relief train has traveled therein, and in the third step, the ground control device releases a subsection traveled by the relief train, of the protective section set in the train, from the protective section.
14 . The train control method according to claim 8 , wherein
in the second step, in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a forward station is found on a third track in a travel direction same as a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the third track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a rearward station is found on the third track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the third track to be the protective section.
15 . The train control system according to claim 2 , wherein in a case where the relief-object train cannot be restored,
when the relief train capable of traveling to a front side of the relief-object train from a forward station on the same track on which the relief-object train has been stopped is found, the train operation control device determines a section from the forward station to the front side of the relief-object train to be the protective section, and when the relief train capable of traveling to a rear side of the relief-object train from a rearward station on the track is found, the train operation control device determines a section from the rearward station to the rear side of the relief-object train to be the protective section.
16 . The train control system according to claim 4 , wherein
in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a station forward from the relief-object train is found on a second track in a travel direction opposite to a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the second track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a station rearward from the relief-object train is found on the second track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the second track to be the protective section.
17 . The train control system according to claim 6 , wherein
in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a forward station is found on a third track in a travel direction same as a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the third track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a rearward station is found on the third track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the third track to be the protective section.
18 . The train control method according to claim 9 , wherein in the second step, in a case where the relief-object train cannot be restored,
when the relief train capable of traveling to a front side of the relief-object train from a forward station on the same track on which the relief-object train has been stopped is found, the train operation control device determines a section from the forward station to the front side of the relief-object train to be the protective section, and when the relief train capable of traveling to a rear side of the relief-object train from a rearward station on the track is found, the train operation control device determines a section from the rearward station to the rear side of the relief-object train to be the protective section.
19 . The train control method according to claim 11 , wherein
in the second step, in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a station forward from the relief-object train is found on a second track in a travel direction opposite to a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the second track to be the protective section, and when the relief train capable of traveling to a front side of the relief-object train from a station rearward from the relief-object train is found on the second track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the second track to be the protective section.
20 . The train control method according to claim 13 , wherein
in the second step, in a case where the relief train is not found on the same first track on which the relief-object train has been stopped, when the relief train capable of traveling to a rear side of the relief-object train from a forward station is found on a third track in a travel direction same as a travel direction of the relief-object train, which is adjacent to the first track, the train operation control device determines a section from the forward station to the rear side of the relief-object train on the third track to be the protective section, and
when the relief train capable of traveling to a front side of the relief-object train from a rearward station is found on the third track, the train operation control device determines a section from the rearward station to the front side of the relief-object train on the third track to be the protective section.Join the waitlist — get patent alerts
Track US2023373543A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.