Abstract

A multiple-part pile cap can include a top portion and a bottom portion that are configured to supply a mechanical interface between a first foundation pile providing a foundation for a structure and a frame of a structure itself. The multiple-part pile cap can be installed onto the first foundation pile of a set of foundation piles driven into the ground to provide the foundation for the structure using the multiple-part pile cap as the mechanical interface between the first foundation pile and the frame of the structure being secured to the first foundation pile. The bottom portion of the multiple-part pile cap can be i) matched in width to a width of a webbing of the first foundation pile and ii) has one or more holes in a first flange of the multiple-part pile cap to be bolted to the webbing of the first foundation pile.

Claims

exact text as granted — not AI-modified
1 . A method for securing a frame of a structure to a foundation; comprising:
 providing a multiple-part pile cap that includes a top portion and a bottom portion to supply a mechanical interface between a first foundation pile providing the foundation for the structure and the frame of the structure itself;   providing the multiple-part pile cap onto the first foundation pile of a set of foundation piles driven into a ground to provide the foundation for the structure using the multiple-part pile cap as the mechanical interface between the first foundation pile and the frame of the structure being secured to the first foundation pile; and   providing the bottom portion of the multiple-part pile cap that is i) matched in width to a width of a webbing of the first foundation pile and ii) has one or more holes in a first flange of the multiple-part pile cap to be bolted to the webbing of the first foundation pile.   
     
     
         2 . The method of  claim 1 , further comprising:
 installing the multiple-part pile cap on the first foundation pile that in which one or more foundation piles of the set of foundation piles driven into the ground have been cut relative the other foundation piles in the set of foundation piles so that portions of the foundation piles in the set of foundation piles extending above ground level form a substantially level plane for the frame of the structure being secured to a set of multiple-part pile caps corresponding to the set of foundation piles so that the frame of the structure will be level when mechanically secured to the set of foundation piles.   
     
     
         3 . The method of  claim 1 , further comprising:
 bolting a first flange of an angle bracket in the bottom portion of the multiple-part pile cap to the webbing in the first foundation pile, where the first flange of the angle bracket is i) matched in width to a width of the webbing and ii) has one or more holes in the first flange to be bolted to the webbing of the first foundation pile.   
     
     
         4 . The method of  claim 1 , further comprising:
 bolting a second flange of an angle bracket in the bottom portion of the multiple-part pile cap to a first flange of another angle bracket in the top portion of the multiple-part pile cap, where one or more holes in the second flange of an angle bracket in the bottom portion are matched in location with one or more holes in the first flange of another angle bracket in the top portion when mated together; and thus, the bottom portion of the multiple-part pile cap is bolted to the top portion of the multiple-part pile cap.   
     
     
         5 . The method of  claim 1 , further comprising:
 bolting the bottom portion of the multiple-part pile cap to the top portion of the multiple-part pile cap, and then, the top portion of the multiple-part pile cap is mechanically secured to the frame of the structure, and then any bolted connections are torqued to be seismically safe.   
     
     
         6 . The method of  claim 1 , further comprising:
 bolting the bottom portion of the multiple-part pile cap to the top portion of the multiple-part pile cap, where the top portion of the multiple-part cap pile is adaptable in form to match both a size and a shape of a frame of the structure that the first foundation pile is attaching to through the top portion of the multiple-part cap pile.   
     
     
         7 . The method of  claim 1 , further comprising:
 where the top portion of the multiple-part cap pile is adaptable in form to match both a size and a shape of a frame of the structure that the first foundation pile is attaching to through the top portion of the multiple-part cap pile, where a first flange in an angle bracket in the bottom portion of the multiple-part cap pile is bolted to i) a first flange of another angle bracket in the top portion of the multiple-part pile cap or ii) a clamp in the top portion of the multiple-part pile cap to be mechanically secured to the frame of the structure being secured to the foundation pile.   
     
     
         8 . The method of  claim 1 , further comprising:
 where the top portion of the multiple-part pile cap is a clamp that mechanically connects to the bottom portion of the multiple-part pile cap and then the clamp clamps onto a flange of the frame of the structure being secured to the foundational pile.   
     
     
         9 . The method of  claim 1 , further comprising:
 where the bottom portion of the multiple-part pile cap is a first angle bracket, where the top portion of the multiple-part pile cap is a second angle bracket, where the first angle bracket in the bottom portion and the second angle bracket in the top portion of the multiple-part pile cap are attached together in opposite 90-degree rotations.   
     
     
         10 . The method of  claim 9 , further comprising:
 where a flange of the second angle bracket in the top portion of the multiple-part pile cap bolts to the frame of the structure.   
     
     
         11 . An apparatus; comprising:
 a multiple-part pile cap includes a top portion and a bottom portion that are configured to supply a mechanical interface between a first foundation pile providing a foundation for a structure and a frame of a structure itself;   wherein the multiple-part pile cap is configured to be installed onto the first foundation pile of a set of foundation piles driven into a ground to provide the foundation for the structure using the multiple-part pile cap as the mechanical interface between the first foundation pile and the frame of the structure being secured to the first foundation pile; and   wherein the bottom portion of the multiple-part pile cap is configured to be i) matched in width to a width of a webbing of the first foundation pile and ii) has one or more holes in a first flange of the multiple-part pile cap to be bolted to the webbing of the first foundation pile.   
     
     
         12 . The apparatus of  claim 11 , further comprising:
 wherein the multiple-part pile cap is configured to be installed on the first foundation pile, where one or more foundation piles of the set of foundation piles driven into the ground have been cut relative the other foundation piles in the set of foundation piles so that portions of the foundation piles in the set of foundation piles extending above ground level form a substantially level plane for the frame of the structure being secured to a set of multiple-part pile caps corresponding to the set of foundation piles so that the frame of the structure will be level when mechanically secured to the set of foundation piles.   
     
     
         13 . The apparatus of  claim 11 , further comprising:
 wherein a first flange of an angle bracket in the bottom portion of the multiple-part pile cap is configured to be mated to the webbing in the first foundation pile, where the first flange of the angle bracket is i) matched in width to a width of the webbing and ii) has one or more holes in the first flange to be bolted to the webbing of the first foundation pile.   
     
     
         14 . The apparatus of  claim 11 , further comprising:
 wherein a second flange of an angle bracket in the bottom portion of the multiple-part pile cap is configured to be bolted to a first flange of another angle bracket in the top portion of the multiple-part pile cap, where one or more holes in the second flange of an angle bracket in the bottom portion are matched in location with one or more holes in the first flange of another angle bracket in the top portion when mated together; and thus, the bottom portion of the multiple-part pile cap is bolted to the top portion of the multiple-part pile cap.   
     
     
         15 . The apparatus of  claim 11 , further comprising:
 wherein the bottom portion of the multiple-part pile cap is configured to be bolted to the top portion of the multiple-part pile cap, and then, the top portion of the multiple-part pile cap is mechanically secured to the frame of the structure, and then any bolted connections are configured to be torqued to be seismically safe.   
     
     
         16 . The apparatus of  claim 11 , further comprising:
 wherein the bottom portion of the multiple-part pile cap is configured to be bolted to the top portion of the multiple-part pile cap, where the top portion of the multiple-part cap pile is adaptable in form to match both a size and a shape of a frame of the structure that the first foundation pile is attaching to through the top portion of the multiple-part cap pile.   
     
     
         17 . The apparatus of  claim 11 , further comprising:
 wherein the top portion of the multiple-part cap pile is adaptable in form to match both a size and a shape of a frame of the structure that the first foundation pile is attaching to through the top portion of the multiple-part cap pile, where a first flange in an angle bracket in the bottom portion of the multiple-part cap pile is configured to be bolted to i) a first flange of another angle bracket in the top portion of the multiple-part pile cap or ii) a clamp in the top portion of the multiple-part pile cap to be mechanically secured to the frame of the structure being secured to the foundation pile.   
     
     
         18 . The apparatus of  claim 11 , further comprising:
 wherein the top portion of the multiple-part pile cap is a clamp that mechanically connects to the bottom portion of the multiple-part pile cap and then the clamp clamps onto a flange of the frame of the structure being secured to the foundational pile.   
     
     
         19 . The apparatus of  claim 11 , further comprising:
 wherein the bottom portion of the multiple-part pile cap is a first angle bracket, where the top portion of the multiple-part pile cap is a second angle bracket, where the first angle bracket in the bottom portion and the second angle bracket in the top portion of the multiple-part pile cap are attached together in opposite 90-degree rotations.   
     
     
         20 . The apparatus of  claim 19 , further comprising:
 where a flange of the second angle bracket in the top portion of the multiple-part pile cap is configured to be bolted to the frame of the structure.