US2024279881A1PendingUtilityA1

High-strength road for water resource regulation system in response to climate change

Assignee: CHEN JUI WENPriority: Sep 10, 2021Filed: May 9, 2022Published: Aug 22, 2024
Est. expirySep 10, 2041(~15.1 yrs left)· nominal 20-yr term from priority
Inventors:Jui-Wen Chen
E01C 3/006E01C 3/06E03F 1/005E01C 3/04E01C 2201/20E01C 11/22E03F 1/00E03F 3/04E03F 5/10E03B 3/02E01C 3/00E01C 11/225
55
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A high-strength road for a water resource regulation system in response to climate change. An underground structural space is formed by a structural system formwork, which is provided with a hollow unit body, by means of grouting and solidifying concrete grout, and the high-strength road is formed by paving a road or a pavement over the underground structural space. The hollow unit body is at least provided with a structural formwork and is formed by means of combining a plurality of side slabs. An upper surface of the formwork is provided with a plate, which is provided with a through hole and at least one through pipe. After the structural system formwork and the side slabs are combined, the concrete grout is grouted and solidifies to form the underground structural space with a high support strength.

Claims

exact text as granted — not AI-modified
I claim: 
     
         1 . A high-strength road for a water resource regulation system in response to climate change, comprising a structure formed by combining a structural formwork of a hollow unit body and solidified concrete grout, the structure forming an underground structural space, a pavement being laid on a top of the underground structural space, wherein the hollow unit body comprises at least one structural formwork and a plurality of side slabs combined with each other; a plate is disposed on an upper surface of the structural formwork, the plate being provided with a through hole and at least one through pipe, wherein the structural formwork and the side slabs are combined together and laid, and concrete grout is grouted into the through pipe of the structural formwork, and the concrete grout solidifies and is capable of forming an underground structural space with a high support strength, the underground structural space forming a water resources regulation road having a water storage and drainage function. 
     
     
         2 . The high-strength road for a water resource regulation system in response to climate change according to  claim 1 , wherein in the structural formwork of the hollow unit body, tenons and mortises, which correspond to each other, are formed in a periphery of the plate to allow the structural formworks of two adjacent unit bodies to joint to each other by means of tenon and mortise joints; and in the side slabs, the slabs are formed with the through holes and are provided, in locations of a side edge, with snap fastening structures for the side slabs to fast attach, through snap engagement, to outsides of the structural formwork to thereby form a hollow unit body. 
     
     
         3 . The high-strength road for a water resource regulation system in response to climate change according to  claim 1 , wherein the hollow unit body is constructed by combining two, upper and lower, structural formworks and four side slabs. 
     
     
         4 . The high-strength road for a water resource regulation system in response to climate change according to  claim 1 , wherein the plate of the structural formwork is provided with hollow tubular pillars arranged in a circumference of the through pipe. 
     
     
         5 . The high-strength road for a water resource regulation system in response to climate change according to  claim 2 , wherein the plate of the structural formwork is provided, on four sides of a top, with snap notches, and snap fastening structures provided in locations of side edges of the side slabs are hooking barbs.

Join the waitlist — get patent alerts

Track US2024279881A1 — get alerts on status changes and closely related new filings.

We store only your email — no account needed. See our privacy policy.