US2024416979A1PendingUtilityA1

Method, device and storage medium for sequencing and managing rail transit line resources

51
Assignee: CASCO SIGNAL LTDPriority: Sep 7, 2022Filed: Nov 30, 2022Published: Dec 19, 2024
Est. expirySep 7, 2042(~16.2 yrs left)· nominal 20-yr term from priority
B61L 27/16B61L 19/06B61L 27/00B61L 27/12
51
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

The present invention relates to a method, device and storage medium for sequencing and managing rail transit line resources. The method includes the following steps: step S 101 : analyzing a trackside line loop deadlock scenario and establishing a static deadlock prevention policy; step S 102 : reasonably making an operation plan to avoid resource deadlock loop wait; step S 103 : applying for all required resources for each train at a time; step S 104 : establishing an operation task order verification mechanism; and step S 105 : monitoring and executing an operation task. Compared with the prior art, the present invention can reduce the idle time of the line resources, improve the utilization rate of the line resources, and avoid the problems of operation deadlock and the mismatch between an actual train operation task and the operation plan.

Claims

exact text as granted — not AI-modified
1 . A method for sequencing and managing rail transit line resources, wherein the method comprises the following steps:
 step S 101 : analyzing a trackside line loop deadlock scenario and establishing a static deadlock prevention policy;   step S 102 : reasonably making an operation plan to avoid resource deadlock loop wait;   step S 103 : applying for all required resources for each train at a time;   step S 104 : establishing an operation task order verification mechanism; and   step S 105 : monitoring and executing an operation task.   
     
     
         2 . The method for sequencing and managing rail transit line resources according to  claim 1 , wherein the step S 101  specifically comprises:
 according to a topological relationship of station yards, analyzing a cyclic chain that may be formed by a train operation path, wherein a resource having been obtained by each train operation task in the cyclic chain is simultaneously requested by the next train operation task; and, according to a topological logic of rail transit station yards and an exclusive characteristic of the resource, determining a loop deadlock scenario, and establishing a static deadlock prevention policy. 
 
     
     
         3 . The method for sequencing and managing rail transit line resources according to  claim 1 , wherein the step S 102  specifically comprises:
 when making the operation plan, avoiding a task order in the loop deadlock scenario and establishing a reasonable train operation task sequence on the basis of a current station type, and assigning a unique operation task sequence number. 
 
     
     
         4 . The method for sequencing and managing rail transit line resources according to  claim 1 , wherein the step S 103  specifically comprises:
 before allocating the resources, applying for, at a time, all the resources required by the current operation task in an order scheduled in the operation plan, sequencing the resources, sequentially transmitting the resources to a train and resource manager on the basis of a sequencing list, and confirming verification. 
 
     
     
         5 . The method for sequencing and managing rail transit line resources according to  claim 4 , wherein the deadlock prevention manner of the method is “whole section application, independent allocation”. 
     
     
         6 . The method for sequencing and managing rail transit line resources according to  claim 5 , wherein the “whole section application, independent allocation” is specifically as follows:
 after the application of a train operation task, if a relevant interlocking check condition is satisfied, any zone of the operation task is assigned to the train immediately, and the allocation of comprehensive line resources of the train and the position of a train ahead are tracked. 
 
     
     
         7 . The method for sequencing and managing rail transit line resources according to  claim 1 , wherein the step S 104  specifically comprises:
 after a train dispatching command system issues an operation task to the train, feeding back, by a resource manager, a serial number of the operation task and a task reception state to the train dispatching command system when receiving an operation task application, and before receiving a feedback from the resource manager, issuing, by the train dispatching command system, no operation task to a subsequent train; and verifying, according to a serial number assigned to the operation task in the operation plan, an order of the operation tasks transmitted by the resource manager and the train dispatching command system. 
 
     
     
         8 . The method for sequencing and managing rail transit line resources according to  claim 7 , wherein requests for all train operation tasks are strictly in an ascending order, and only after a previous request is satisfied can the next operation task be applied. 
     
     
         9 . The method for sequencing and managing rail transit line resources according to  claim 7 , wherein the serial number assigned to the operation task shall not be arbitrarily changed once assigned, and the operation plan shall be strictly matched. 
     
     
         10 . The method for sequencing and managing rail transit line resources according to  claim 1 , wherein the step S 105  is specifically as follows:
 receiving tasks by the resource manager, reasonably sequencing and managing the trains applying for the rail transit line resources; and safely and orderly operating the trains according to the obtained line resources and the established movement authorization. 
 
     
     
         11 . The method for sequencing and managing rail transit line resources according to  claim 10 , wherein in the method, sequencing is performed according to the principle of first come, first served; and exclusive line resources are sequentially allocated for subsequent trains according to an operation task execution process and a resource releasing process of the trains, so as to ensure that the operation of each train strictly matches a requirement of the operation plan of the train dispatching command system. 
     
     
         12 . The method for sequencing and managing rail transit line resources according to  claim 1 , wherein in the method, whether the resources are exclusive or shared by a plurality of trains is determined according to the operation directions of the trains and the position of a railroad switch; and if the resources are in a non-conflicting state, then the resources can be shared. 
     
     
         13 . An electronic device, comprising a processor and a memory in which a computer program is stored, wherein the processor, when executing the program, implements the method according to  claim 1 . 
     
     
         14 . A computer-readable storage medium in which a computer program is stored, wherein the program, when being executed by a processor, implements the method according to  claim 1 .

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.