US2025354402A1PendingUtilityA1
Foundation systems and utility pole installations and methods including same
Est. expiryMay 15, 2044(~17.8 yrs left)· nominal 20-yr term from priority
Inventors:Chad SchwartzRobert PietrocolaJoseph J. NemethCurtis Bruce StimpsonFelipe S. BenalcazarAndrew R. Lisicki
E02D 2600/20E02D 27/42E02D 7/22E02D 5/56E04H 12/223E04H 12/08E04H 12/2261E04H 12/2253E04H 12/2223
59
PatentIndex Score
0
Cited by
0
References
0
Claims
Abstract
A foundation system for mounting a utility pole includes a foundation base member, a plurality of anchor piles, and a plurality of anchor adapters. The foundation base member is configured to support the utility pole. The foundation base member includes a plurality of preformed holes defining an array of preformed through holes. The plurality of anchor piles is configured to be driven into the ground. The plurality of anchor adapters is configured to secure the foundation base member to the anchor piles. The plurality of preformed through holes are arranged to receive the anchor adapters.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A foundation system for mounting a utility pole, the foundation system comprising:
a foundation base member configured to support the utility pole, the foundation base member including a plurality of preformed holes defining an array of preformed through holes; a plurality of anchor piles configured to be driven into the ground; and a plurality of anchor adapters configured to secure the foundation base member to the anchor piles; wherein the plurality of preformed through holes are arranged to receive the anchor adapters.
2 . The foundation system of claim 1 wherein the foundation base member is a grate.
3 . The foundation system of claim 1 wherein:
each anchor adapter includes a wedge connector configured to be received in a pile bore of a respective one of the anchor piles and to secure the anchor adapter to the respective anchor pile.
4 . The foundation system of claim 3 wherein each wedge connector includes:
a threaded rod;
at least one wedge member; and
a drive nut threadedly mounted on the threaded rod and operable to displace the wedge member.
5 . The foundation system of claim 4 wherein:
the at least one wedge member includes an elongate slot;
the threaded rod extends into the wedge member through the elongate slot; and
the slot permits the wedge member to translate radially relative to the threaded rod.
6 . The foundation system of claim 4 wherein:
each wedge connector includes a first wedge member and a second wedge member each having a sloped bearing face;
the sloped bearing face of the first wedge member slidably engages the sloped bearing surface of the second wedge member; and
the drive nut is drivable to displace the first wedge member relative to the second wedge member and thereby force at least one of the first and second wedge members radially outward to press against an inner surface of the respective pile bore.
7 . The foundation system of claim 6 including:
a retainer nut on the thread rod and coupling the thread rod to the second wedge member; and
a cage member that prevents rotation of the retainer nut relative to the second wedge member.
8 . A method for installing a foundation system for mounting a utility pole, the method comprising:
providing a foundation base member including preformed through holes; thereafter driving anchor piles into the earth until a prescribed minimum torque is achieved; installing respective anchor adapters on each anchor pile; positioning a foundation base member over the anchor adapters such that each anchor adapter aligns with a respective one of the preformed through holes of the plurality of preformed holes of the foundation base member, the foundation base member configured to support the utility pole; and, securing the foundation base member to the anchor piles.
9 . The method of claim 8 , wherein the plurality of preformed holes defines an array of preformed through holes.
10 . The method of claim 8 , wherein the foundation base member is a grate.
11 . The method of claim 8 further comprising the step of inserting a wedge connector of an anchor adapter into a respective one of the anchor piles and securing the anchor adapter to the respective anchor pile.
12 . The method of claim 11 wherein each wedge connector includes:
a threaded rod;
at least one wedge member; and
a drive nut threadedly mounted on the threaded rod and operable to displace the wedge member.
13 . The method of claim 12 wherein:
the at least one wedge member includes an elongate slot;
the threaded rod extends into the wedge member through the elongate slot; and
the slot permits the wedge member to translate radially relative to the threaded rod.
14 . The method of claim 12 wherein:
each wedge connector includes a first wedge member and a second wedge member each having a sloped bearing face;
the sloped bearing face of the first wedge member slidably engages the sloped bearing surface of the second wedge member; and
the drive nut is drivable to displace the first wedge member relative to the second wedge member and thereby force at least one of the first and second wedge members radially outward to press against an inner surface of the respective pile bore.
15 . The method of claim 14 wherein the wedge connector includes:
a retainer nut on the thread rod and coupling the thread rod to the second wedge member; and
a cage member that prevents rotation of the retainer nut relative to the second wedge member.
16 . The method of claim 14 wherein each wedge connector includes a tension indicator operative to indicate a tension load on the threaded rod.
17 . A foundation system for mounting a utility pole, the foundation system comprising:
a foundation base member configured to support the utility pole; a plurality of anchor piles configured to be driven into the ground; and a plurality of anchor adapters configured to secure the foundation base member to the anchor piles;
wherein each anchor adapter includes a wedge connector configured to be received in a pile bore of a respective one of the anchor piles and to secure the anchor adapter to the respective anchor pile.
18 . The foundation system of claim 17 wherein each wedge connector includes:
a threaded rod;
at least one wedge member; and
a drive nut threadedly mounted on the threaded rod and operable to displace the wedge member.
19 . The foundation system of claim 18 wherein:
the at least one wedge member includes an elongate slot;
the threaded rod extends into the wedge member through the elongate slot; and
the slot permits the wedge member to translate radially relative to the threaded rod.
20 . The foundation system of claim 18 wherein:
each wedge connector includes a first wedge member and a second wedge member each having a sloped bearing face;
the sloped bearing face of the first wedge member slidably engages the sloped bearing surface of the second wedge member; and
the drive nut is drivable to displace the first wedge member relative to the second wedge member and thereby force at least one of the first and second wedge members radially outward to press against an inner surface of the respective pile bore.Cited by (0)
No later patents cite this yet.
References (0)
No backward citations on record.