US2026036041A1PendingUtilityA1

Borehole measurement method and system

40
Assignee: IMDEX TECH PTY LTDPriority: Nov 1, 2022Filed: Oct 31, 2023Published: Feb 5, 2026
Est. expiryNov 1, 2042(~16.3 yrs left)· nominal 20-yr term from priority
E21B 2200/20E21B 47/12E21B 47/09E21B 2200/22E21B 49/00E21B 47/00G01V 3/18G01V 1/242G01V 3/38G01V 1/46
40
PatentIndex Score
0
Cited by
0
References
0
Claims

Abstract

A method for logging a borehole executed by at least one processor of a computing device. First measurement data of the borehole is received, wherein the first measurement data is generated by a measurement device operating in a first operational mode, and during a first movement of the measurement device along a path within the borehole, and in a direction heading into the borehole. Borehole evaluation data is generated to evaluate the first measurement data of the borehole. The processor determines, based on the borehole evaluation data, a second operational mode of the measurement device to enable the measurement device to generate second measurement data during a second movement of the measurement device in an opposing direction along the path. Logging of the borehole is performed using the measurement device operating in at least the second operational mode.

Claims

exact text as granted — not AI-modified
1 . A method for logging a borehole executed by at least one processor of a computing device, the method comprising:
 receiving first measurement data of the borehole, wherein the first measurement data is generated by a measurement device operating in a first operational mode, and during a first movement of the measurement device along a path within the borehole, and in a direction heading into the borehole;   generating borehole evaluation data to evaluate the first measurement data of the borehole;   determining, based on the borehole evaluation data, a second operational mode of the measurement device to enable the measurement device to generate second measurement data during a second movement of the measurement device in the direction or an opposing direction along the path; and   logging the borehole using the measurement device operating in at least the second operational mode,   wherein each operational mode determines at least one of: one or more speeds of the measurement device within the borehole; and one or more states of one or more sensors of the measurement device for generating the first and second measurement data.   
     
     
         2 . The method of  claim 1 , wherein the first measurement data is received in real-time, or substantially real-time, with the generation of the first measurement data by the measurement device. 
     
     
         3 . The method of  any of the preceding claims , wherein the path extends substantially between the collar and the end of the borehole. 
     
     
         4 . The method of  any of the preceding claims , wherein the first measurement data and the second measurement data each include: one or more geological measurements of the borehole: and an indication of a corresponding measurement position of the measurement device within the borehole. 
     
     
         5 . The method of  claim 4 , wherein the borehole evaluation data includes region of interest (ROI) data indicating one or more determined ROIs within the borehole. 
     
     
         6 . The method of  claim 5 , wherein determining the one or more ROIs includes processing the first measurement data by: i) retrieving one or more geological model values: and ii) comparing the geological model values to the geological measurements of the first measurement data. 
     
     
         7 . The method of any of  claims 5 to 6 , wherein the ROI data includes, for each determined ROI, an indication of the location of the ROI within the borehole. 
     
     
         8 . The method of  claim 7 , wherein the location of each ROI within the borehole is determined over an interval of measurement positions of the first measurement data, and provides an indication of the occurrence of the ROI relative to the path within the borehole. 
     
     
         9 . The method of any of  claims 5 to 8 , wherein the ROI data includes, for each determined ROI, an indication of a classification of the formation and/or strata of the borehole within or at the ROI. 
     
     
         10 . The method of any of  claims 1 to 9 , wherein each state of the one or more sensors of the measurement device comprises an activation state indicating whether the corresponding sensor is enabled to generate the measurement data. 
     
     
         11 . The method of  claim 10 , wherein determining the second operational mode of the measurement device comprises generating adjustment data indicating one or more adjustments to at least one of: the one or more speeds; and the one or more activation states of the one or more sensors, of the first operational mode to measure the borehole in the determined ROIs. 
     
     
         12 . The method of  claim 11 , wherein the one or more adjustments include a determination of a speed of the measurement device for generating the second measurement data over a corresponding determined ROI, wherein the determined speed of the measurement device is based, at least in part on, the one or more sensors of the measurement device that are activated for generating the second measurement data over the corresponding determined ROI. 
     
     
         13 . The method of any of  claims 1 to 12 , further comprising:
 retrieving profile data representing characteristics of one or more other boreholes;   processing the retrieved profile data to generate one or more of:
 device configuration data representing, at least, an operational mode of the measurement device; and 
 evaluation criteria data for generating the borehole evaluation data. 
   
     
     
         14 . The method of  claim 13 , wherein the one or more other boreholes each have a collar distance to the borehole that is less than or equal to or a pre-determined threshold distance. 
     
     
         15 . The method of any of  claims 13 to 14 , wherein the profile data is maintained by a remote computing system configured to:
 transmit the profile data from a storage medium of the remote computing system to the at least one processor;   receive, from the at least one processor, updated profile data representing one or more characteristics of the borehole as determined based on at least one of the first measurement data and the second measurement data; and   store the updated profile data in the storage medium of the remote computing system.   
     
     
         16 . The method of any of  claims 1 to 15 , further comprising generating a measurement control signal to instruct a logging device to operate the measurement device to generate the first or second measurement data according to the first and second operational modes. 
     
     
         17 . The method of any of  claims 1 to 16 , further comprising:
 (i) in response to logging the borehole using the measurement device, obtaining logging data of the borehole, the logging data comprising measurement data generated using the measurement device;   (ii) processing the logging data to determine whether to re-log the borehole; and   (iii) in response to a positive determination in step (ii), performing a re-logging of the borehole using a selected measurement device.   
     
     
         18 . The method of  claim 17 , further comprising: setting or adjusting, based on the logging data, an operational mode of the selected measurement device to perform the re-logging of step (iii). 
     
     
         19 . The method of any of  claims 17 to 18 , wherein the selected measurement device is selectively determined from a plurality of measurement devices of a logging platform. 
     
     
         20 . The method of  claim 19 , wherein the selected measurement device is determined based on one or more of: a set of device characteristics of the one more measurement devices of the platform; a workflow state of the one or more measurement devices of the platform. 
     
     
         21 . The method of any of  claims 17 to 20 , wherein selected measurement device used to re-log the borehole in step (iii) is the same measurement device enabling the obtaining of the logging data in step (i). 
     
     
         22 . The method of any of  claims 17 to 21 , further comprising: (iv) repeating steps (i) to (iii) in response to the re-logging of the borehole. 
     
     
         23 . A method for measuring a borehole using a measurement device disposed within the borehole, the method comprising:
 generating, by one or more sensors of the measurement device, first measurement data of the borehole, wherein the measurement device operates in a first operational mode and moves in a first movement along a path within the borehole, and in a direction heading into the borehole;   processing the first measurement data to generate region of interest (ROI) data indicating: (i) one or more geological ROIs within the borehole; and (ii) one or more corresponding operational mode parameters to enable the measurement device to measure the borehole;   determining a second operational mode of the measurement device based on the ROI data; and   generating, by the one or more sensors of the measurement device, second measurement data of the borehole by operating the measurement device in the second operational mode during a second movement in the direction or an opposing direction along the path,   wherein each operational mode determines at least one of: one or more speeds of the measurement device within the borehole; and one or more states of the one or more sensors of the measurement device.   
     
     
         24 . The method of  claim 23 , wherein the second operational mode is determined by modifying the first operational mode of the measurement device according to the corresponding operational mode parameters. 
     
     
         25 . The method of any of  claims 23 to 24 , wherein the one or more ROIs are determined by processing the first measurement data by: i) retrieving one or more geological model values; and ii) comparing the geological model values to the geological measurements of the first measurement data. 
     
     
         26 . The method of any of  claims 23 to 25 , further comprising:
 retrieving borehole profile data representing one or more characteristics of one or more like boreholes associated with the borehole;   processing the retrieved borehole profile data to generate one or more of:
 device configuration data determining the first operational mode of the measurement device; and 
 evaluation criteria data determining the generation of the borehole evaluation data. 
   
     
     
         27 . An apparatus for logging a borehole, comprising:
 a measurement device;   a logging device; and   a controller having:
 a communications interface to receive data; 
 at least one computer processor to execute program instructions; and 
 a memory, coupled to the at least one computer processor, to store program instructions for execution by the at least one computer processor, 
   wherein the logging device is configured to:
 receive a measurement device control signal from the controller; 
 in response to receiving the measurement device control signal, cause the measurement device to operate within the borehole, 
   wherein the measurement device is configured to:
 generate first measurement data of the borehole in response to the measurement device being caused to operate in a first operational mode, and during a first movement of the measurement device along a path within the borehole, and in a direction heading into the borehole; 
 generate second measurement data of the borehole in response to the measurement device being caused to operate in a second operational mode, and during a second movement of the measurement device in the direction or an opposing direction along the path; and 
 transmit, to the controller, the first measurement data and the second measurement data, 
 wherein each operational mode determines at least one of: one or more speeds of the measurement device within the borehole; and one or more states of one or more sensors of the measurement device for generating the first and second measurement data, and 
   wherein the controller is configured to:
 receive the first measurement data of the borehole; 
 generate borehole evaluation data to evaluate the first measurement data of the borehole; 
 determine, based on the borehole evaluation data, the second operational mode of the measurement device; 
 generate the measurement device control signal to cause the measurement device to operate in the second operational mode to log the borehole; and 
 transmit the control signal to the logging device to cause logging of the borehole by using the measurement device operating in at least the second operational mode.

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.