Advancing a bottom hole assembly into a wellbore
Abstract
A method can include deploying a tubular string into a perforated section of a wellbore, and introducing a diverting agent into a fluid flow in an annulus surrounding the tubular string, the diverting agent blocking the fluid flow through a set of perforations in the perforated section, thereby increasing a flow rate of the fluid flow in the annulus surrounding the tubular string and advancing the tubular string through the wellbore. Another method can include deploying a tubular string into a perforated section of a wellbore, the perforated section including multiple sets of perforations, a first set of the perforations being positioned uphole of a second set of the perforations, and blocking the first set of the perforations, thereby increasing a flow rate of fluid flow in an annulus surrounding the tubular string and advancing the tubular string through the wellbore.
Claims
exact text as granted — not AI-modifiedWhat is claimed is:
1 . A method for use with a subterranean well, the method comprising:
deploying a tubular string into a perforated section of a wellbore; and introducing a diverting agent into a fluid flow in an annulus surrounding the tubular string, the diverting agent blocking the fluid flow through a first set of perforations in the perforated section, thereby increasing a flow rate of the fluid flow in the annulus surrounding the tubular string and advancing the tubular string through the wellbore.
2 . The method of claim 1 , in which the tubular string comprises at least one vibratory tool.
3 . The method of claim 1 , in which the tubular string comprises multiple vibratory tools.
4 . The method of claim 1 , in which the first set of the perforations blocked by the diverting agent are positioned uphole relative to a second set of the perforations that are not blocked by the diverting agent.
5 . The method of claim 1 , in which the flow rate increasing comprises increasing a fluid drag force on the tubular string.
6 . The method of claim 1 , in which the tubular string comprises a bottom hole assembly, and the bottom hole assembly comprises a fluid motor and a drill bit.
7 . The method of claim 6 , further comprising flowing a fluid through the fluid motor and the drill bit prior to the diverting agent introducing.
8 . The method of claim 6 , further comprising flowing a fluid through the fluid motor and the drill bit after the diverting agent introducing.
9 . The method of claim 6 , further comprising flowing a fluid through the fluid motor and the drill bit concurrently with the advancing.
10 . The method of claim 1 , further comprising, after the tubular string advancing, the diverting agent degrading in the well, thereby unblocking the first set of the perforations.
11 . The method of claim 1 , further comprising, after the tubular string advancing, dislodging the diverting agent with the tubular string, thereby unblocking the first set of the perforations.
12 . A method for use with a subterranean well, the method comprising:
deploying a tubular string into a perforated section of a wellbore, the perforated section comprising first and second sets of perforations, the first set of perforations being positioned uphole of a second set of the perforations; and blocking the first set of the perforations, thereby increasing a flow rate of fluid flow in an annulus surrounding the tubular string and advancing the tubular string through the wellbore.
13 . The method of claim 12 , in which the blocking comprises introducing a diverting agent into the fluid flow.
14 . The method of claim 13 , in which the diverting agent comprises multiple plugging devices.
15 . The method of claim 13 , in which the diverting agent comprises a particulate diverter.
16 . The method of claim 13 , further comprising, after the tubular string advancing, the diverting agent degrading in the well, thereby unblocking the first set of the perforations.
17 . The method of claim 13 , further comprising, after the tubular string advancing, dislodging the diverting agent with the tubular string, thereby unblocking the first set of the perforations.
18 . The method of claim 12 , in which the tubular string comprises at least one vibratory tool.
19 . The method of claim 12 , in which the tubular string comprises multiple vibratory tools.
20 . The method of claim 12 , in which the second set of the perforations is not blocked prior to the tubular string advancing.
21 . The method of claim 12 , in which the flow rate increasing comprises increasing a fluid drag force on the tubular string.
22 . The method of claim 12 , in which the tubular string comprises a bottom hole assembly, and the bottom hole assembly comprises a fluid motor and a drill bit.
23 . The method of claim 22 , further comprising flowing a fluid through the fluid motor and the drill bit prior to the blocking.
24 . The method of claim 22 , further comprising flowing a fluid through the fluid motor and the drill bit after the blocking.
25 . The method of claim 22 , further comprising flowing a fluid through the fluid motor and the drill bit concurrently with the advancing.Join the waitlist — get patent alerts
Track US2026085589A1 — get alerts on status changes and closely related new filings.
We store only your email — no account needed. See our privacy policy.