P
US4430841AExpiredUtilityPatentIndex 72

Method of filling a crack in concrete

Assignee: SHO BOND CONSTPriority: Nov 20, 1980Filed: Dec 11, 1980Granted: Feb 14, 1984
Est. expiryNov 20, 2000(expired)· nominal 20-yr term from priority
Inventors:YAMAGUCHI AKIHIROOHKURA MASATOSHI
E04G 23/0203E04G 23/0211E04G 23/02
72
PatentIndex Score
14
Cited by
2
References
2
Claims

Abstract

The pressure to the cracks in the concrete building and the like exerted by a binding material supplied thereinto is buffered by the expansion of a pressure buffering portion located somewhere between the supply pump and the supply pipe and after the supply pump is disconnected, the binding material supplying operation is succeeded by the pressure buffering portion which, having therein reserved the binding material by expansion, forces the binding material out into the cracks by contraction.

Claims

exact text as granted — not AI-modified
We claim: 
     
       1. A method of filling a crack in concrete by supplying a binder under pressure from a binder supply source into the crack, comprising the steps of providing a pressure buffering portion intermediate the binder supply source and the crack for passing the binder from the binder supply source to the crack, the buffering portion having an elastic tube, an end pipe connected to one end of the elastic tube and a flat washer at an end of the end pipe, engaging the washer over and around the crack with the end pipe end over the crack, providing a supply pipe between the supply source and an opposite end portion of the elastic tube with means for connecting the elastic tube and the supply pipe, and providing check valve means for preventing the binder supplied from flowing backwards out of the elastic tube, buffering the binder supply pressure exerted on the crack by increasing the capacity of the elastic tube, storing a reserve of the binder in the elastic tube, and supplying the crack with the binder by the continuous reduction and capacity of the elastic tube so that the crack does not increase in size. 
     
     
       2. A method of filling a crack in concrete by supplying a binder under pressure from a binder supply source into the crack, comprising the steps of providing a pressure buffering portion intermediate the binder supply source and the crack for passing the binder from the binder supply source to the crack, the buffering portion having an elastic tube, an end pipe connected to one end of the elastic tube, engaging the end pipe over the crack with the end pipe end over the crack, providing a supply pipe between the supply source and an opposite end portion of the elastic tube with means for connecting the elastic tube and the supply pipe, and providing check valve means for preventing the binder supplied from flowing backwards out of the elastic tube, buffering the binder supply pressure exerted on the crack by increasing the capacity of the elastic tube, storing a reserve of the binder in the elastic tube, and supplying the crack with the binder by the continuous reduction and capacity of the elastic tube so that the crack does not increase in size.

Cited by (0)

No later patents cite this yet.

References (0)

No backward citations on record.