Inventor · disambiguated record
Fuming Wang
Also filed as: WANG FUMING
34 granted patents·16 pending applications·26 citations·filing 2010–2025
94Inventor score
Files withINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA10ASML NETHERLANDS BV9HENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD6WELEAD INFRASTRUCTURE ENGINEERING TECH (ZHENGZHOU) LTD5SAFEKEY ENGINEERING TECH ZHENGZHOU LTD3
Top patents by PatentIndex Score
50 records- 0185US2025355366A1Method for calibrating simulation process based on defect-based process windowASML NETHERLANDS BV·Filed 2025·Application pending·0 cites
- 0284US9045865B2Polymer grouting method for uplifting ballastless track of high-speed railHENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD·Filed 2013·Granted Jun 2, 2015·5 cites·1 claims
- 0382US11378891B2Method for determining contribution to a fingerprintASML NETHERLANDS BV·Filed 2020·Granted Jul 5, 2022·1 cites·20 claims
- 0479US10816904B2Method for determining contribution to a fingerprintASML NETHERLANDS BV·Filed 2018·Granted Oct 27, 2020·2 cites·26 claims
- 0577US11473713B2Trenchless integrative repair method for concrete drainage pipeline with cracking, corrosion and subsidenceINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Oct 18, 2022·1 cites·8 claims
- 0677US9777881B2Polymer composite grouting method for blocking leaking and sand inrush of underground pipelinesSAFEKEY ENG TECHNOLOGY(ZHENGZHOU) LTD·Filed 2015·Granted Oct 3, 2017·4 cites·10 claims
- 0767US12386268B2Method for calibrating simulation process based on defect-based process windowASML NETHERLANDS BV·Filed 2021·Granted Aug 12, 2025·0 cites·20 claims
- 0867US8272811B2Process for grouting a curtain with polymerWANG FUMING·Filed 2010·Granted Sep 25, 2012·3 cites·18 claims
- 0967US2022342319A1Method for determining contribution to a fingerprintASML NETHERLANDS BV·Filed 2022·Application pending·0 cites
- 1065US9004820B2Grouting method for anchoring with polymerHENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD·Filed 2013·Granted Apr 14, 2015·5 cites·1 claims
- 1164US12152360B2Vibratory grouting drilling rig with auxiliary moving mechanismSAFEKEY ENGINEERING TECH ZHENGZHOU LTD·Filed 2023·Granted Nov 26, 2024·0 cites·13 claims
- 1264US11085166B2Composite slotting equipment combined static pressure and vibration of polymer anti-seepage wall and using method thereofWELEAD INFRASTRUCTURE ENGINEERING TECH ZHENGZHOU LTD·Filed 2020·Granted Aug 10, 2021·0 cites·9 claims
- 1364US8293325B2Polymer injection method for blocking piping in dikes and damsWANG FUMING·Filed 2010·Granted Oct 23, 2012·2 cites·13 claims
- 1462US11104612B2Rapid-hardening underground pipeline grouting repair polymer and preparing methodINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2019·Granted Aug 31, 2021·0 cites·5 claims
- 1561US2020256027A1Composite slotting equipment combined static pressure and vibration of polymer anti-seepage wall and using method thereofWELEAD INFRASTRUCTURE ENGINEERING TECH (ZHENGZHOU) LTD·Filed 2020·Application pending·0 cites
- 1660US12371869B2Grouting pipe with vibration functionSAFEKEY ENGINEERING TECH ZHENGZHOU LTD·Filed 2023·Granted Jul 29, 2025·0 cites·6 claims
- 1759US2023046682A1Mask defect detectionASML NETHERLANDS BV·Filed 2022·Application pending·0 cites
- 1857US9080300B2Polymer grouting method for constructing ultra-thin anti-seepage wallHENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD·Filed 2013·Granted Jul 14, 2015·1 cites·3 claims
- 1956US12189307B2Metrology data correction using image quality metricASML NETHERLANDS BV·Filed 2019·Granted Jan 7, 2025·0 cites·20 claims
- 2056US9353888B2Polymer bag grouting method for repairing settlement of underground pipelinesSAFEKEY ENGINEERING TECHNOLOGY ZHENGZHOU LTD·Filed 2015·Granted May 31, 2016·1 cites·6 claims
- 2155US8182178B2Directional fracture grouting method with polymer for seepage control of dikes and damsWANG FUMING·Filed 2010·Granted May 22, 2012·1 cites·20 claims
- 2254US11499284B2Trough plate for constructing locked polymer anti-seepage wall and construction method of locked polymer anti-seepage wallUNIV ZHENGZHOU·Filed 2021·Granted Nov 15, 2022·0 cites·8 claims
- 2354US11414826B2System and method for sealing expanded polymer-based pile shoes for jacketUNIV ZHEJIANG·Filed 2021·Granted Aug 16, 2022·0 cites·10 claims
- 2453US11585467B2Trenchless methods for forming curved hole channel with steel sleeve and pipeline liftingINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Feb 21, 2023·0 cites·7 claims
- 2553US2023221652A1Process window based on failure rateASML NETHERLANS B V·Filed 2021·Application pending·0 cites
- 2652US2023323621A1Grouting double-locking pressure real-time sensing system and method for operating the sameSAFEKEY ENGINEERING TECH ZHENGZHOU LTD·Filed 2023·Application pending·0 cites
- 2752US2025378548A1Parameterized inspection image simulationASML NETHERLANDS BV·Filed 2023·Application pending·0 cites
- 2851US12222264B2Accelerated loading road-testing deviceSOUTHERN MARINE SCIENCE AND ENG GUANGDONG LABORATORY ZHUHAI·Filed 2022·Granted Feb 11, 2025·0 cites·17 claims
- 2951US11346487B2Support tool and back-pressure grouting device for leakage repair of inspection well and repair method thereofINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted May 31, 2022·0 cites·7 claims
- 3051US11231139B2Detecting and repairing method for external diseases of buried drainage pipelineINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Jan 25, 2022·0 cites·15 claims
- 3149US11149400B2Thin-slotting lifting synchronous grouting device and its usage methodINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Oct 19, 2021·0 cites·8 claims
- 3249US2025333288A1Cleaning granule dispensing device, dispensing method and beverage machineKALERM TECH SUZHOU CO LTD·Filed 2025·Application pending·0 cites
- 3349US2025331673A1Granule feeding device and beverage machineKALERM TECH SUZHOU CO LTD·Filed 2025·Application pending·0 cites
- 3448US11598065B2Method for stabilizing and lifting channel boards by underwater groutingUNIV ZHENGZHOU·Filed 2021·Granted Mar 7, 2023·0 cites·17 claims
- 3548US11274784B2In-service repair method combining externally bonded pre-stressed FRP and polymer grouting for PCCP with broken wireWELEAD INFRASTRUCTURE ENGINEERING TECH ZHENGZHOU LTD·Filed 2020·Granted Mar 15, 2022·0 cites·10 claims
- 3647US2020318774A1Local repair method combining internally bonded CFRP and polymer grouting for cracks in drainage pipeInfrastructure Renewal Insitute of Southern China·Filed 2020·Application pending·0 cites
- 3745US11149399B2Track-type jet grouting integrated systemINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Oct 19, 2021·0 cites·3 claims
- 3845US11079057B2Trenchless rehabilitation device for disconnects on large-diameter concrete drainage pipe and method thereofWELEAD INFRASTRUCTURE ENGINEERING TECH ZHENGZHOU LTD·Filed 2020·Granted Aug 3, 2021·0 cites·10 claims
- 3945US2014314496A1Polymer grouting method for constructing multi-wing pileHENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD·Filed 2014·Application pending·0 cites
- 4044US11549804B2Detection apparatus and method for flow deformation of foundation layer in horizontal directionUNIV SUN YAT SEN·Filed 2021·Granted Jan 10, 2023·0 cites·10 claims
- 4144US10907761B2In-service and trenchless repair method for disconnection of drainage pipelineINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Feb 2, 2021·0 cites·16 claims
- 4244US2014229436A1Method of File Synchronization and Electronic Device ThereofWISTRON CORP·Filed 2013·Application pending·0 cites
- 4344US2014314497A1Polymer grouting method for constructing gravel pileHENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD·Filed 2014·Application pending·0 cites
- 4444US2022074160A1Pile-cylinder-truss composite offshore wind turbine foundation and construction process thereofUNIV ZHEJIANG·Filed 2020·Application pending·0 cites
- 4544US2022327364A1Semiconductor device geometry method and systemASML NETHERLANDS BV·Filed 2020·Application pending·0 cites
- 4643US11002398B2Trenchless rehabilitation system for deformation of large diameter HDPE pipelines and method thereofWELEAD INFRASTRUCTURE ENGINEERING TECH ZHENGZHOU LTD·Filed 2020·Granted May 11, 2021·0 cites·13 claims
- 4743US8974152B2Polymer grouting method for constructing vertical supporting systemHENAN POLYTECH INFRASTRUCTURE REHABILITATION LTD·Filed 2013·Granted Mar 10, 2015·0 cites·3 claims
- 4841US11319690B2Assembled recyclable rectangular working well with preset detachable door opening and construction method thereofINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted May 3, 2022·0 cites·5 claims
- 4941US11143027B2Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereofINFRASTRUCTURE RENEWAL INST OF SOUTHERN CHINA·Filed 2020·Granted Oct 12, 2021·0 cites·8 claims
- 5034US2014244583A1Method of Processing File changes and Electronic Device ThereofWISTRON CORP·Filed 2013·Application pending·0 cites
Join the waitlist — get patent alerts
Get an alert when Fuming Wang files or is granted a new patent.
We store only your email — no account needed. See our privacy policy.
Identity basis: PatentsView inventor disambiguation (2025Q4-odp release). How scoring works →